My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/07/05 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/07/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2017 10:15:39 AM
Creation date
9/6/2017 10:14:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FY? <br /> 6 <br /> hour workshop). Four additional hours budgeted for meeting preparation, agenda and <br /> meeting notes. <br /> 2. Site will be evaluated based upon the most recent(at time of the scope) version of the <br /> Department of Ecology's Stormwater Management Manual for Western Washington. <br /> Deliverables . <br /> 1. Responses to City comments on the 50% level documents will be provided in an Excel <br /> spreadsheet. <br /> 2. Draft 90% contract documents (specifications book, half size 11x17 drawings) in electronic <br /> format(Word and PDF, emailed). <br /> 3. Draft Stormwater Site Plan (emailed PDF). <br /> 4. 90% comment log responses (emailed PDF). <br /> 5. Final 90% comment log, following 90% Workshop (emailed PDF). <br /> Task 1300 Final Design Services <br /> Objective . <br /> 1. Prepare bid-ready(100% design level) Contract Documents. <br /> 2. Prepare Engineer's Opinion of Probable Construction Cost(OPCC) at the 100% design <br /> level. <br /> HDR Services <br /> 1. Produce Contract Bid Documents (100%). Produced final signed and sealed Contract <br /> Drawings and Specifications <br /> 2. Update the Preliminary Engineer's Estimate of Probable Construction Cost. Estimate of the <br /> construction cost will follow the expected level of accuracy for an Associate for the <br /> Advancement of Cost Engineering Class 2 estimate, refined per the final signed contract <br /> documents package. - <br /> 3. Final Stormwater Site Plan. <br /> 4. Design team will conduct bi-weekly team meetings to coordinate and discuss design issues <br /> as they arise. Owner is invited to participate as needed. Specific City staff may be <br /> requested for certain topics. <br /> 5. Provide in-house QA/QC of all discipline design documents. Provide an overall coordination <br /> QA/QC review to identify potential conflicts. <br /> Client Responsibilities <br /> 1. Complete a service application and coordinate with Snohomish PUD No. 1 for the Chlorine <br /> Building <br /> Assumptions <br /> 1. Final design will be based on the Final Engineering Report design criteria and layout. <br /> 2. The City will produce and transmit final design documents to the DOE for approval. <br /> City of Everett—WPCF FEN Phase 2 I742Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.