My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERE 1"1 PUBLIC WORKS 01 70 00 <br /> SPECIAL PROVISIONS EXECUTION AND CLOSEOUT REQUIREMENTS <br /> 3. Remove and replace defective and nonconformingWork. <br /> p <br /> 4. Remove samples of installed Work for testing. <br /> ' 5. Provide openings in elements of Work for penetrations of mechanical and electrical <br /> Work. <br /> ' D. Execute Work by methods to avoid damage to other Work and to provide proper surfaces to <br /> receive patching and finishing. <br /> E. Cut masonry and concrete materials using masonry saw or core drill. <br /> F. Restore Work with new products according to requirements of Contract Documents. <br /> ' G. Fit Work tight to pipes, sleeves, ducts, conduits, and other penetrations through walls and <br /> surfaces. <br /> H. Maintain integrity of wall,ceiling, or floor construction; completely seal voids. <br /> I. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest <br /> intersection; for assembly,refinish entire unit. <br /> ' J. Identify hazardous substances or conditions exposed during the Work to Engineer for decision <br /> or remedy. <br /> 3.5 PROTECTING INSTALLED CONSTRUCTION <br /> ' A. Protect installed Work and provide special protection where specified in individual <br /> Specification Sections. <br /> ' B. Provide temporary and removable protection for installed products. Control activity in <br /> immediate Work area to prevent damage. <br /> C. Prohibit traffic from landscaped areas. <br /> 1 <br /> 3.6 FINAL CLEANING <br /> A. Execute cleaning and disinfection of all new pipe in accordance with Section 33 13 00 — <br /> Disinfecting of Water Utility Distribution. <br /> B. Remove waste and surplus materials,rubbish,and construction facilities from Site. <br /> END OF SECTION <br /> I <br /> THREE LAKES VALVE BYPASS July 19,2017 <br /> WO#UP3611 01 70 00 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.