My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> B. The Work also includes, and is not limited to, structural, electrical, site civil, and miscellaneous <br /> Work. This includes, and is not limited to, furnishing all labor, materials, and equipment <br /> necessary to perform all Work as required by the Contract in accordance with the Contract <br /> Documents. <br /> C. Location: Three Lakes Valve, located generally east of 14822 Three Lakes Road, Snohomish, <br /> WA 98290. <br /> D. Land and Access: <br /> 1. Contract Documents identify land, rights-of-way, and easements for the Work to be <br /> accessed and performed. <br /> 1.4 CONTRACT TIME <br /> A. Description: <br /> 1. Perform Work within time stated in Document 00 60 13 -Contract. 111 <br /> 2. Bidder,in submitting an offer, accepts Contract Time period stated for performing Work. <br /> 1.5 DEFINITIONS <br /> A. Bidding Documents: Contract Documents supplemented with Advertisement for Bids, <br /> Instructions to Bidders, Information Available to Bidders, Bid Form, Bid securities, and <br /> Specifications. <br /> B. Contract Documents: As defined in Document 00 72 13 - General Conditions, including issued <br /> Addenda. <br /> C. Bid: Executed Bid Form and required attachments submitted acrnrding to Instructions to <br /> Bidders. <br /> D. Bid Sum: Monetary sum identified by Bidder in Bid Form. <br /> 1.6 CONTRACT DOCUMENTS IDENTIFICATION <br /> A. Contract Documents are identified as Project Number WO No. UP3611, as prepared by <br /> Engineer and as identified in Project Manual. <br /> 1.7 AVAILABILITY OF DOCUMENTS <br /> A. Bidding Documents may be obtained as indicated in Advertisement for Bids. I <br /> B. Purpose: <br /> 1. Bidding Documents are made available only for the purpose of obtaining offers for the 1 <br /> Project. <br /> THREE LAKES BYPASS July 19, 2017 <br /> WO#UP3611 00 21 13 -2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.