My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 9/28/2017
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 10:09:34 AM
Creation date
9/11/2017 10:12:34 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
9/28/2017
Council Approval Date
8/23/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Three Lakes Bypass
Public Works WO Number
UP3611
Tracking Number
0000810
Total Compensation
$1,217,490.34
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 4/28/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
McClure and Sons Inc. 8/22/2018 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 2. Insure all materials necessary for proceeding with the tie-in work are on-site a <br /> minimum of one week prior to the scheduled tie-in connection. <br /> Item 4 - ARTICLE 3.3 - EXECUTION <br /> Revise 3.3.A.2. to read as follows: <br /> 2. Contractor: <br /> a. Tie-in in work must be completed within 36 consecutive hours after City Water <br /> Operations has removed the head off the line and turned over to Contractor. <br /> 1) The 36 hour time allotment will begin when the City Representative gives <br /> the Contractor written notice that the pressure head is off the pipe. <br /> b. Tie-in work must be completed prior to the 36-inch pipe installation. <br /> All other requirements of the contract documents remain in effect. <br /> City � F asq <br /> •• <br /> of Everett � W Y� <br /> C4 Is d <br /> ,rp <br /> Richard Hefti, P.E. 44526 <br /> Project Manager j � ' y <br /> Addendum 2 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.