My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/11/25 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/11/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 4:56:31 PM
Creation date
11/30/2015 4:56:15 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/25/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> • <br /> Anticipated O&M Submittals <br /> • <br /> 02820 • Fence and Gates <br /> 05550 . Access Hatches • <br /> 07411 Metal Roof Panels <br /> 08330 Rolling Service Doors <br /> 08710 Door Hardware <br /> 10200 Louvers and Vents <br /> • 11310 Dry Pit Non-Clog Sewage Pumps <br /> 11315 Flow Meters <br /> 13405 Odor Control System <br /> 14420 • Monorail Trolley and Hoists <br /> 15100 Valves <br /> 15250 Pressure Indicator Transmitters <br /> 15410 Plumbing Fixtures • <br /> 15700 Heating Ventilation Air Conditioning Equipment • <br /> 16170 • Disconnects and Fused Switches • <br /> 16180 Overcurrent Protective Devices <br /> 16200 Power Generation <br /> 16201 Automatic Transfer Switches <br /> 16300 Surge Protective Devices <br /> 16500 Lighting <br /> 16910 Variable Frequency Drives • <br /> 16920 Motor Control Equipment <br /> 16921 Control System <br /> • <br /> BHC and the appropriate subconsultants will review the contractor compiled Operations and Maintenance <br /> • Manual to confirm the document contains the required O&M submittals,and is integrated,indexed,and <br /> organized in a logical manner that meets the requirements specification Section 01730. The BHC review effort <br /> • is budgeted to require 16 hours for a design engineer;4 hours for a principal engineer and 2 hours for clerical. <br /> 2.4 Preparing description of operations. BHC will develop a Pump Station operation and control description <br /> • <br /> for LS33 and LS43 to supplement the contractor supplied O&M materials. This description would be based on <br /> ;'dell i 1 Cl,, c_ 1 9 9Y System I �documents prepared by BEC <br /> ills Ilall"alive provided =C'.. �.loi� G•3%1 CC...`i{�I S�,':"'iii I'.+:.t':'.t. .. <br /> design that include the Pump Conuci Strategy memo and the Pump Selection memo. <br /> 2.5 Assisting the City in preparing contract change initiatives(CCis). As the day-to-day construction <br /> manager,the City will have the primary role of preparing and reviewing CCIs. At the request of the City,BHC <br /> and the appropriate subconsultants will provide technical assistance to the City and as part,will prepare CCIs. <br /> For each BHC led CCI,assistance is budgeted to require up to 8 hours for a design engineer, 1 hour for a <br /> principal engineer,3 hours for CAD,and 1/2 hour for clerical. For each subconsultant led CCI,BHC review is <br /> budgeted to require 4 hours for a design engineer,Y2 hour for a principal engineer, 1 hour for CAD,and/2 hour <br /> for clerical. <br /> 2.6 Attending construction meetings and per forming site visits. BHC will perform up to 30 site <br /> visits/meetings during construction(approximately one visit/meeting every week for the month of August 2015, <br /> one visit/meeting every other Week from September 2015 through August 2016,and additional visits as <br /> requested for commissioning and startup.) Each visit/meeting is budgeted to require 4 hours. Meetings are <br /> budgeted for one BHC attendee. Subconsultant assumptions for number of construction meetings/site visits are <br /> gage o of 8 -�--�` <br /> 20 October 2015 �S �„ , <br />
The URL can be used to link to this page
Your browser does not support the video tag.