Laserfiche WebLink
ARTICLE 2. EXISTING SITE AND FACILITY INFORMATION <br /> 2.1 Existing Site and Facility Information <br /> Design-Builder has been provided access to the documents listed in Table 2.1 below, via transmittal <br /> with the RFP. <br /> Design-Builder may rely on documents included in Table 2.1 only to the extent specifically called out <br /> in that table. <br /> [NOTE TO PROPOSERS:PROPOSERS ARE RESPONSIBLE FOR CONDUCTING ALL FIELD VERIFICATION <br /> AND INSPECTIONS ETC.TO VERIFY INFORMATION AND DEVELOP PROPOSAL PRICING UNLESS <br /> OTHERWISE INDICATED IN TABLE 2.1] <br /> Table 2.1: Existing Site and Facility Information <br /> DOCUMENT DATE EXTENT TO WHICH DESIGN-BUILDER CAN RELY <br /> East Clearwell Related Documents <br /> Full size Record Drawings: 1983 Design-Builder may rely on drawings to ascertain <br /> Water Filtration Facilities Clearwell by general arrangement of facilities and approximate <br /> Gray&Osborne Consulting dimensions.All dimensions of the East Clearwell must <br /> Engineers. be field verified for final confirmation of dimensions <br /> prior to roof fabrication. <br /> In addition,Clearwell Roof Plan and Clearwell Control <br /> Structure drawings(M16-17, M19-21,and S18-20A)) <br /> and Clearwell Structural Drawings(S21-23)may be <br /> relied upon to support structural analysis required <br /> under Article 4,Section 4.4, but such reliance is only <br /> allowed if the structural analysis states specifically <br /> what data from (M16-17 and M19-21)and (S19-23) <br /> the structural analysis relies upon. <br /> Additional Record Drawings-Site 1983 Design-Builder may rely on drawings to ascertain <br /> Plan, Preload Fill Plan, Dwg S18 and general arrangement of facilities and approximate <br /> Structural Details Dwg. dimensions.All dimensions of the East Clearwell must <br /> Water Filtration Facilities Clearwell by be field verified for final confirmation of dimensions <br /> Gray&Osborne Consulting prior to roof fabrication. <br /> Engineers. <br /> Specifications for Water Filtration 1983 Design-Builder may rely on specifications for required <br /> Facilities Clearwell by Gray& concrete strength to support structural analysis <br /> Osborne Consulting Engineers. required under Article 4,Section 4.4, but such <br /> reliance is only allowed if the structural analysis states <br /> specifically what data from the specifications the <br /> structural analysis relies upon. <br /> Brown &Caldwell 2002 Record 2002 Full size record drawing showing repair work done to <br /> Drawing glulam beam connections. Extent Design-Builder may <br /> rely on this drawing is same as indicated in Table 2.1 <br /> for Gray and Osborne Consulting Engineers 1983 <br /> record drawings. <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 2 <br />