My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> DOCUMENT DATE EXTENT TO WHICH DESIGN-BUILDER CAN RELY <br /> Water Filtration Plant Site Plan 2017 Design-Builder may rely on drawing to ascertain <br /> general arrangement of facilities and approximate <br /> dimensions.All dimensions and utility locations must <br /> be field verified where required for construction <br /> activities. <br /> Roof Assessment Report by CG December 7, General reference information and not for reliance. <br /> Engineering 2016 <br /> ALS Environmental Lead(TCLP)Test May 2,2017 General reference information and not for reliance. <br /> Results for Existing Painted Roof <br /> Geotechnical: March 13, In support of the structural analysis under Article 4, <br /> Geotechnical Report for Preliminary 2006 Section 4.4,the Design-Builder may rely on the <br /> Design City of Everett Proposed following:boring and test pit log data in Appendix A; <br /> Clearwell No.2 geotechnical laboratory testing procedures and results <br /> in Appendix B, but not interpretation;and <br /> supplemental Cone Penetration Test data, but not <br /> interpretation. Design-Builder shall not apply seismic <br /> design criteria found in this report to the East <br /> Clearwell Roof Replacement Project, but may <br /> reference it for a general understanding of the original <br /> design. <br /> Photos of corroded items inside of 2016 Provided for developing Proposal pricing regarding <br /> the East Clearwell.(Attached to Roof corrosion repair.To be field verified. <br /> Assessment Report by CG <br /> Engineering) <br /> Photos of East Clearwell floor cracks 2017 Provided for developing pricing for specified crack <br /> (Attached to Geotest Report) length.To be field verified. <br /> Subsurface and Rebar Scan - Ground 2017 General reference information and not for reliance. <br /> Penetrating Radar Evaluation by <br /> Geotest <br /> Screen House Bridge Related Documents <br /> Conceptual Design Drawings: Provided for developing pricing for demolishing <br /> Screen House Bridge Demolition and 2017 existing bridge and installation of City provided Screen <br /> Replacement House Bridge <br /> Conceptual Design Specifications: Provided for developing pricing for demolishing <br /> (1)Screen House Bridge Demolition 2017 existing bridge and installation of City provided Screen <br /> and Replacement House Bridge <br /> ALS Environmental Lead (TCLP)Test May 2,2017 General reference information and not for reliance. <br /> Results for Existing Metal Bridge <br /> Railing <br /> NVL Labs Metal Analysis of Existing August 1, General reference information and not for reliance. <br /> Bridge Railing 2016 <br /> Bridge Installation Guide Dec 6,2011 General reference information and not for reliance. <br /> AutoCAD File for Conceptual Bridge General reference information and not for reliance. <br /> Replacement Drawings <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.