T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> 4.6.2 East Clearwell Crack Repair <br /> See Article 2, Existing Site and Facility Information,for photographs of cracks in East Clearwell floors. <br /> Design-Builder shall inspect and verify the length of wall and floor crack repair required with the <br /> Owner's Representative. <br /> Design-Builder shall repair all interior floor and wall cracks greater than 0.01 inches wide. Repair <br /> shall include pressure injection of the cracks with an expanding urethane grout specifically <br /> manufactured for this purpose and that is ANSI/NSF 61 approved. Inject water into the crack before <br /> injecting the grout per the manufacturer's recommendations. <br /> Product options include DeNeef Hydro Active Flex LV or SikaFix HH LV, by Sika Corporation, or other <br /> expanding urethane grout meeting ANSI/NSF 61 with approval of the Owner's Representative. <br /> The allowance amount for crack repair is$18,032.00 for 300 feet(estimated total for East <br /> Clearwell), which is a unit price of$60.1067 per foot of crack repair. If Design-Builder repairs less <br /> than 300 feet,then a deductive Change Order will be issued for the allowance amount not spent, <br /> calculated based on the unit price and the difference between 300 feet and the amount of repair <br /> actually completed. If Design-Builder repairs more than 300 feet,then a Change Order will be issued <br /> to increase the Contract Price, calculated based on the unit price and the amount of repair <br /> completed in excess of 300 feet. <br /> Based on the City's visual inspections,the City believes that these cracks do not represent a <br /> structural integrity issue. If Design-Builder believes, based on its inspection,that any cracks may be <br /> structural in nature, it shall promptly notify and consult with the Owner's Representative prior to <br /> initiating any structural repair. <br /> 4.6.3 Refurbishment of Corroded Items <br /> See Article 2, Existing Site and Facility Information,for photographs East Clearwell columns and <br /> structural connection points. Design-Builder shall inspect and verify the condition of columns and <br /> structural connection points, and identify any repairs needed to facilitate the Design-Builders <br /> Acceptable Roof System installation with the Owner's Representative. <br /> Repairs, if identified, shall include concrete and metal repair and replacement using ANSI/NSF 61 <br /> approved materials.Assume,for the purposes of estimating costs, that the top two feet of each <br /> existing structural column will require refurbishment work. <br /> The allowance amount for Refurbishment of Corroded Items is$68,473.00 for 21 columns, which is <br /> a unit price of$3,260.62 per each repair location of corroded item repair. If Design-Builder repairs <br /> fewer than 21 columns,then a deductive Change Order will be issued for the allowance amount not <br /> spent, calculated based on the unit price and the difference between 21 columns and the amount of <br /> repair work actually completed. <br /> 4.6.4 East Clearwell Leakage <br /> Based on testing conducted by the City, the East Clearwell structure is leaking at a rate of <br /> approximately 21 gpm (31,000 gal per day). <br /> The City conducted leak testing according to Section 6.2 of AWWA standard D115-06 for tendon <br /> stressed concrete tanks, with some modifications: <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 13 <br />