My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
chlorine residual. If the initial disinfection fails, water in the clearwell will be chlorinated and retested <br /> until satisfactory results are obtained. <br /> The East Clearwell shall not be put back on-line without written approval from the Owner's <br /> Representative. <br /> City Forces will perform the entire disinfection process after Design-Builder's successfully completes <br /> tank cleaning. <br /> ARTICLE 5. CONSTRUCTION <br /> 5.1 General <br /> The requirements of this article apply to all construction related activities, including demolition,site <br /> restoration, and testing activities further described in Articles 6,7, and 8, respectively. <br /> 5.2 Hours of Construction <br /> Design-Builder shall only conduct construction-related activities between the following hours: <br /> • Monday through Friday-6:00 AM to 6:00 PM. <br /> • Weekends: Generally, no construction activity work will be allowed. Occasional work on <br /> weekends may be allowed subject to approval by the Owner's Representative, but no earlier <br /> than 8:00 AM and no later than 6:00 PM. <br /> 5.3 Site Access <br /> 53.1 Project Site <br /> Access to the East Clearwell and Screen House Bridge shall be via the primary site access gate as <br /> shown on the site plan below. A map of existing facilities and yard piping is available for download <br /> (see Table 2.1). <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.