My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T Bailey Inc 9/28/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
T Bailey Inc 9/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:12:52 AM
Creation date
10/10/2017 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
T Bailey Inc
Approval Date
9/28/2017
Council Approval Date
9/13/2017
End Date
6/15/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WPF East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0000873
Total Compensation
$3,022,197.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
T BAILEY INC 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT ACCESS FOR 41,,:,ta"' 'er•' '- ".` <br /> SCREEN HOUSE BRIDGE SCREEN ` ' ' '� 0t#a*" <br /> REMOVAL AND REPLACEMENT -'' ' ""' <br /> {POTHOLE TO CONFIRM DEPTHS BRIDGEj " � • <br /> AND PROTECT ALL EXISTING :11::414:"'4:::::::"..,4 " �' �rBURIED PIPING, INCLUDING 24" + . ef *STEEL RECOVERED WATER LINE :,2,::::: <br /> ` �■ <br /> AND DUAL 51"RAW WATER LINES) ;, ,, <br /> - , : a l� I EAST , <br /> �*` CLEARAELL <br /> r „zit <br /> ` �. " " , t , , : POWER « <br /> \` UTILITY LINES - .,. ... <br /> ,;-, ,. <br /> (APPROX) : � <br /> 71111 47;41....,:le-44:40esieldr.,,, 7 4 i - •. di-,„ 4 _ <br /> CITY LIGHT '. <br /> •, <br /> ,� ,,,{ �ik. <br /> - . - _'LES ,� <br /> �,?PROX;i ;'', rrf A.,,4- <br /> „. ' 1 <br /> a- _ <br /> It 4 WEST <br /> CLEARWELL `*� EQUIPMENT <br /> °"`” (BURIED) ACCESS FOR " <br /> ' ROOF '' <br /> REPLACEMENT <br /> `1 HEAVY EQUIPMENT ,/, <br /> -4., RESTRICTED TO , «0°<4 <br /> lko. . ' <br /> PROTECT BURIED <br /> , „ , WEST CLEARWELL <br /> ,! wo .09 <br /> +� <br /> .. <br /> '"ir. AC *4... °Ifr."‘ a ", \ $ <br /> 4,• ENTRANCE GATE <br /> A* <br /> Figure 1.Water Filtration Plant Site Access and Limitations <br /> 5.4 Site Preparation and Staging <br /> 5.4.1 General <br /> The following requirements apply to construction: <br /> 1. Site preparation shall not damage existing structures, and shall avoid damage to existing <br /> landscaping and vegetation to the maximum extent practicable. If Design-Builder believes tree <br /> removal will be required, it shall notify Owner's Representative. Design-Builder is responsible for <br /> fully restoring any damaged gravel or turfed areas to existing condition or better. <br /> City of Everett September 13,2017 <br /> Water Filtration Plant Clearwell Roof Replacement DB Project Supplementary Conditions Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.