My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/12/23 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/12/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 9:47:23 AM
Creation date
12/24/2015 1:42:26 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Deliverables <br /> 1. Meeting notes from workshops, PDF file via email. <br /> 2. Field investigation report (approximately 2-4 pages)for each primary discipline, PDF <br /> files via email. <br /> 3. Summary Technical Memorandum (approximately 5-10 pages) identifying the results of <br /> the modeling work, PDF file via email. TM will be divided into stages by flow path <br /> identifying whether the flow path currently meets 60MGD and/or what improvements are <br /> recommended to reach 60MGD. The identified stages will be as follows: <br /> a) Stage 1: Recirculation channel into Oxidation Pond (flow into Oxidation Pond) <br /> b) Stage 2: Oxidation Pond into recirculation channel (flow out of Oxidation Pond) <br /> c) Stage 3: Recirculation Channel through culverts (Oxidation Pond to Polishing Pond) <br /> d) Stage 4: Polishing Pond through culverts into Chlorination Channel <br /> e) Stage 5: Chlorination Channel <br /> f) Stage 6: FEN Pump Station <br /> g) Stage 7: Discharge from FEN into Snohomish River <br /> 4. Single-Line Electrical diagram, PDF file via email. <br /> 5. PLC/Control System Block diagram, PDF file, via email. <br /> Task 300 — Conceptual Chlorine Building <br /> Objective • <br /> HDR will meet with the City to review current chlorination processes, and develop a conceptual <br /> building layout. <br /> HDR Services <br /> 1. Develop a location, preliminary layout and design configuration for the new chlorine <br /> building. The new chlorine building will be located near the existing building and will <br /> include the following minimum features: <br /> a) Pile support system. <br /> b) Footprint of approximately 30 ft x 20 ft. <br /> c) Partially below grade secondary containment/spill control. <br /> d) Two new sodium hypochlorite storage tanks (HDPE or FRP construction)with means <br /> for removal from the new building. <br /> e) Hypochlorite delivery station, with spill control/containment, located on the exterior of <br /> the facility. <br /> f) Approximately three to four new chlorine dosing feed pumps (pump type to be <br /> confirmed/selected by the City) to provide automatic flow pacing/dosing. <br /> g) One transfer pump {pump type to be confirmed./selected by the City) for moving <br /> bet':''r`eann storage tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.