My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak Inc 10/30/2017 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
Otak Inc 10/30/2017 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 9:16:48 AM
Creation date
12/14/2017 9:16:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc
Approval Date
10/30/2017
Council Approval Date
10/25/2017
End Date
12/31/2018
Department
Public Works
Department Project Manager
Halley Kimball
Subject / Project Title
DID 5 Downstream Dike Repair Design
Public Works WO Number
UP3652
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$409,443.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Continued <br /> • Endangered Species Act review <br /> • Magnuson-Stevens Act review <br /> • National Historic Preservation Act (Section 106) <br /> • State Environmental Policy Act (SEPA) <br /> • Washington Department of Fish and Wildlife Hydraulic Project Approval (HPA) <br /> • Washington Dept. of Ecology Section 401 water quality certification <br /> • Washington Dept. of Ecology Construction Stormwater General Permit <br /> • Coastal Zone Management Consistency Determination <br /> • Shoreline development compliance,including flood hazard and critical areas regulations per the <br /> City of Everett Shoreline Management Program. <br /> Task 4.1 Permitting Support <br /> The Otak team will assist the City on behalf of DD5 with environmental permitting for the project <br /> with federal, state, and local regulatory agencies. Otak will prepare the Joint Aquatic Resources <br /> Permit Application (JARPA) drawings to accompany the JARPA form.The City will complete the <br /> JARPA form with assistance as needed from Otak. Otak will also prepare the Notice of Intent <br /> (NOI) for the Construction Stormwater General Permit (CSGP), and the Water Quality Monitoring <br /> and Protection Plan (WQMPP) that will be required for the Section 401 Water Quality Certification <br /> from the Washington Department of Ecology. For all other required approvals/permits, support <br /> will be upon City request. <br /> Deliverables: <br /> • JARPA Drawings, 8.5 x 11", electronic file (PDF format) to Corps'graphic standards, and <br /> Quantities for JARPA <br /> • Notice of Intent (NOl) for the Construction Stormwater General Permit (CSGP) <br /> • Water Quality Monitoring and Protection Plan (WQMPP), electronic file (PDF format). <br /> Assumptions: <br /> • The City will complete and submit hard and digital copies of the JARPA form to the USACE, <br /> WDFW, and Ecology for the Section 404/10 permits, Section 401 permit, Coastal Zone <br /> Management Consistency Determination, and HPA. Otak will assist as needed to complete the <br /> JARPA form. <br /> • The City will coordinate with all regulatory agencies for permitting with assistance from Otak. <br /> • The City will complete the SEPA Checklist with assistance from Otak. <br /> • The City will acquire all local permits required for compliance with the City of Everett shoreline <br /> management plan, flood hazard regulations, SEPA, and critical areas regulations,with assistance <br /> from Otak as needed. <br /> DD5 Dike Repairs and Improvements Project 5 <br /> otak <br /> K:\project\32700\32758\Contract\Phase2_Scope\Scope for Phase 2-DD5 dike repairs final_17_1010.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.