My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/11/15 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/11/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 9:54:58 AM
Creation date
12/20/2017 9:54:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 1 3 <br /> PROJECT TITLE: <br /> Amendment No. 3 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with Consent Contact Person Ed Fisher,P.E. <br /> GeoEngineers for the Lake Action Phone Number 425-257-8932 <br /> Chaplain Road culvert First Reading FOR AGENDA OF November 15, 2017 <br /> replacement project Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant Amendment No. 2 March 29, 2017 Amendment No. 3 Legal,Public Works <br /> Amount Budgeted $1,100,000.00 Account Nnmber(s): UP3616-1 <br /> Expenditure Required $ 7,914.00 <br /> Budget Remaining 922,525.00 <br /> Additional Required Account Number(s): UP3616-2 <br /> DETAILED SUMMARY STATEMENT: <br /> Amendment No. 3 adds engineering services related to unexpected site conditions and resulting construction <br /> activities. Services include revised site observation and consultation support as follows: <br /> • Geotechnical engineering support for unforeseen subgrade rock and excessive groundwater <br /> encountered during construction. <br /> • Biologist support for stream-bed sediment gradation and required construction. <br /> • Additional site visits due to unforeseen construction conditions requiring consultant services. <br /> The Agreement is modified increasing the contract amount by$7,914 (plus Washington State sales tax) so <br /> that total compensation,including all services and expenses, shall not exceed$177,475.00. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 3 to the Professional Services Agreement with GeoEngineers <br /> for the Lake Chaplain Road culvert replacement project in the amount not to exceed$7,914.00,plus <br /> Washington State sales tax. <br /> 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.