My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3231 BROADWAY 2018-01-11
>
Address Records
>
BROADWAY
>
3231
>
3231 BROADWAY 2018-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 2:35:26 PM
Creation date
1/11/2018 2:34:56 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3231
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> PUBLIC WORKS <br /> January 9, 2015 UPDATED with new review comments <br /> Mr. James Haugen <br /> 9917 N Davies Road <br /> Lake Stevens, WA 98258 <br /> Project: Fire and Building Corrections <br /> Owner: James Haugen <br /> Job Address: 3231 Broadway <br /> Plan Review: BW1410-004 <br /> Fire Citation: CE 14-1026 <br /> Code Enforcement: CE 14-1025 <br /> RE: Incomplete Resubmitta/for Fire Department and Egress 3"d Corrections Letter <br /> Dear Mr. Haugen, <br /> The drawings submitted on Wednesday, January 7, 2015 for our meeting today are <br /> incomplete, based on the third corrections letter e-mailed to you on January 5, 2015. <br /> Plan review will resume when the requested information is submitted: two sets of <br /> re�ised architectura/drawings and structura/calculations for the fire escape, with a <br /> response letter indicating how corrections are resolved on the plan set from the <br /> Architect and the Professional Engineer. <br /> In addition to comments on the third corrections letter referenced above, <br /> please provide the resulting details to verify that the fire escape meets the <br /> 100 psf load required for an exit, per retroactive requirements of the IFC <br /> section 1104.16.5. <br /> 1. The drawings and calculations should indicate the exit live load requirements <br /> referenced above. <br /> 2. The ladder termination will be accepted by the Fire Department, if the ladder <br /> extends to the surface of the alley, per IFC section 1104.16.6. <br /> 3. The drawings should indicate new construction for the fire escape structural <br /> frame, guards, handrails and the exit ladder. <br /> a. Typically this is communicated with heavier line weights. <br /> ' S,i.�cerel�[{ <br /> i � , ,�__ <br /> / � ,��, <br /> ! eg Haley,�tA <br /> Plan Review Architect, 425-257-8813 <br /> � <br /> cc: Robert;�. Wicks, Jr., RA, Circa Design Group Steve Ingalsbe, Senior Planner <br /> �, Nick Lehtinen, P.E., HNLehtinen Engineering FM Rick Robinson, Fire Department <br /> �vin Fagerstrom, Code Enforcement AFM Jim Venturo, Fire Department <br /> Tony Lee, Building Official Ted Budden, Chief Inspector <br /> Paul McKee, Permit Services Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.