Laserfiche WebLink
Section 2 : Authorization is hereby given to provide for the <br /> development of contract plans , specifications and detailed cost <br /> estimates and construction required to provide the following : <br /> A . Northeast Everett Neighborhood Improvements <br /> 1. Allocate $29, 243 for the following street and <br /> sidewalk improvement projects : <br /> a . 12th Street - Maple to East Marine $29, 243 <br /> View Drive. <br /> Construct new curbs, gutters, drainage <br /> sidewalks , and street overlay on both the <br /> north and south sides of the street . <br /> b. 17th Street - Cedar to Baker. An additional <br /> project will be paid for by $48, 309 street <br /> overlay funds . It will include the <br /> construction of new curbs, gutters and <br /> sidewalks on the north and south sides of <br /> the street . <br /> B. Port Gardner Neighborhood Improvements <br /> 1. Allocate $22, 100 for the following street and <br /> sidewalk improvement projects. <br /> a. 33rd Street - Rucker to Grand $14, 500 <br /> Construct new sidewalks behind existing curb <br /> on both sides of the street. <br /> b. 34th Street - Oakes to Lombard $ 3, 400 <br /> Replace broken land raised sidewalk on the <br /> east and west sides of the street . <br /> c. High Street - 38th to 41st $ 4 , 200 <br /> Replace/repair broken sidewalks as needed on <br /> the east and west sides of the street . <br /> C. Riverside Neighborhood <br /> 1. Allocate $28, 400 for the following street and <br /> sidewalk improvement projects : <br /> a. Summit Avenue - 21st to 23rd $28, 400 <br /> Construct curbs , gutters, and sidewalks on <br /> the east side of the street. <br />