My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
>
Address Records
>
BROADWAY
>
931
>
TEUTSCH STUDENT HOUSING
>
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 10:00:50 AM
Creation date
1/17/2018 4:21:42 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
TEUTSCH STUDENT HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> of iilternational at��d domestic stucicnts �t�d their r�itcs of vchi.cle ownership). Tl�e applicant rt�last <br /> collect data for each school quarter to monitor vehicle ownership and parking utilization. <br /> � A parking covenant for the off-site parking shall be recorded on the title of the parking lot propert�� <br /> �and on title of the student housin ro ert rior to construction ermit issuance. The covenant shall <br /> gP P YP P <br /> include a requirement stating that the occupancy of the building may not be changed to non-student <br /> housing unless the amount and location of off-street parking required for the converted housing is <br /> approved by the City. A draft copy of the parking covenant shall be submitted at the time of <br /> constructionpermitsubmittal. ��1�,._-„C�C` � �����30�-��� <br /> VE C� <br /> d.) A current campus Parking Lot Map and a corresponding Parking Inventory Matrix is required to be <br /> submitted at the time of construction permit application submittals. This information is available <br /> from Everett Community College. ���`�Y Ye�Ur��� <br /> �/e.) Note: Students residing within the building are not eligible for residential parking permits for the <br /> Residential Parking Zone. <br /> 4. A landscaping plan is required to be submitted with the construction permit applications (Building Permit <br /> and Public Works Permit applications).Note: Landscaping is required along the north side of the <br /> bililclin��(rem�ve paveme.nt) �t�cl in the earvecl rnrt `n��k' areas �djacent t� th�� a11e�'�ne�se�pin�must <br /> meet Cha�ter 35 and Chapter 31A_requirements. Irrigation systems must be provid.ed in alllandscaped <br /> areas per Section 35.115 (including the right-of-way). A 2 year maintenance assurance device must be <br /> provided for the landscaping per Section 35.130B after final landscaping inspecti and approval. City 1 <br /> provided Maintenance Assurance Device forms are available upon request ����� C ��.� UVIt,�,��, <br /> � (.,V�I.S�1.1',£1 '1f'O l,\(, �/I �-�,ki <br /> � Site Plan Corrections—The following corrections listed below are required on the Site Plan on sheet A- � <br /> � SD 1.00. A site plan will be required at the time of building permit submittal. � �' <br /> ✓a.) Include the Height Calculations for the building with the benchmark noted, average base elevation <br /> and actual height per the City of Everett Planning Department Building Height Handout. Also show <br /> the height calculations on the elevation drawings. <br /> Include the "Project Data"table shown on the cover page on sheet A-SD 1.00. <br /> c. Include the followizlg in the "Project Data"table: Parcel number, legal description, impervious area <br /> calculations, a note that parking will be ovided off site at Yarcel #s per Parkinb <br /> Lot Covenant AFN#�2�11� D��11ll� 'ity will fr.11 in #once recordec�. <br /> �) Show all building dirnensions, proposed setbacks from all lot lines including off Broadway, any <br /> proposed rockeries, retaining walls and fences. <br /> ✓e.) Show any easements. <br /> � If located outdoors, show the placement and screening of refuse disposal areas. Areas must be <br /> provided per Section 39.080 of the Zoning Code as follows: Garbage receptacles, dumpsters, and <br /> recycle bins shall be provided and shall not be located in a required front setback area. All garbage <br /> dumpsters and recycle bins tnust be screened frozn view from the street and from adjacent properties. <br /> This screening may be done using dense vegetation or by placing the dumpster or recycle bin in a <br /> ` structural enclosure. All mechanical equipm.ent, loading and trash collection areas shall be screened <br /> by a com �nation of masonry alls and planting. Sou d buffering should be used to reduce noise <br /> impacts���` �,L `b���� �� `VU 1,.���1 s <br /> � � <br /> �6. This property is located near thc �verett Smelter Site/Asarco cleanup area. Contact the Department of <br /> Ecology for information and requirements, if any, reparding contaminated soil cleanup at: <br /> � ��„< <br /> D,��,�'D' �S ��S � rr�f�• b FINAL MDNS SEPA#t16-008 ��� <br /> � � � ��� _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.