Laserfiche WebLink
� � <br /> of iilternational at��d domestic stucicnts �t�d their r�itcs of vchi.cle ownership). Tl�e applicant rt�last <br /> collect data for each school quarter to monitor vehicle ownership and parking utilization. <br /> � A parking covenant for the off-site parking shall be recorded on the title of the parking lot propert�� <br /> �and on title of the student housin ro ert rior to construction ermit issuance. The covenant shall <br /> gP P YP P <br /> include a requirement stating that the occupancy of the building may not be changed to non-student <br /> housing unless the amount and location of off-street parking required for the converted housing is <br /> approved by the City. A draft copy of the parking covenant shall be submitted at the time of <br /> constructionpermitsubmittal. ��1�,._-„C�C` � �����30�-��� <br /> VE C� <br /> d.) A current campus Parking Lot Map and a corresponding Parking Inventory Matrix is required to be <br /> submitted at the time of construction permit application submittals. This information is available <br /> from Everett Community College. ���`�Y Ye�Ur��� <br /> �/e.) Note: Students residing within the building are not eligible for residential parking permits for the <br /> Residential Parking Zone. <br /> 4. A landscaping plan is required to be submitted with the construction permit applications (Building Permit <br /> and Public Works Permit applications).Note: Landscaping is required along the north side of the <br /> bililclin��(rem�ve paveme.nt) �t�cl in the earvecl rnrt `n��k' areas �djacent t� th�� a11e�'�ne�se�pin�must <br /> meet Cha�ter 35 and Chapter 31A_requirements. Irrigation systems must be provid.ed in alllandscaped <br /> areas per Section 35.115 (including the right-of-way). A 2 year maintenance assurance device must be <br /> provided for the landscaping per Section 35.130B after final landscaping inspecti and approval. City 1 <br /> provided Maintenance Assurance Device forms are available upon request ����� C ��.� UVIt,�,��, <br /> � (.,V�I.S�1.1',£1 '1f'O l,\(, �/I �-�,ki <br /> � Site Plan Corrections—The following corrections listed below are required on the Site Plan on sheet A- � <br /> � SD 1.00. A site plan will be required at the time of building permit submittal. � �' <br /> ✓a.) Include the Height Calculations for the building with the benchmark noted, average base elevation <br /> and actual height per the City of Everett Planning Department Building Height Handout. Also show <br /> the height calculations on the elevation drawings. <br /> Include the "Project Data"table shown on the cover page on sheet A-SD 1.00. <br /> c. Include the followizlg in the "Project Data"table: Parcel number, legal description, impervious area <br /> calculations, a note that parking will be ovided off site at Yarcel #s per Parkinb <br /> Lot Covenant AFN#�2�11� D��11ll� 'ity will fr.11 in #once recordec�. <br /> �) Show all building dirnensions, proposed setbacks from all lot lines including off Broadway, any <br /> proposed rockeries, retaining walls and fences. <br /> ✓e.) Show any easements. <br /> � If located outdoors, show the placement and screening of refuse disposal areas. Areas must be <br /> provided per Section 39.080 of the Zoning Code as follows: Garbage receptacles, dumpsters, and <br /> recycle bins shall be provided and shall not be located in a required front setback area. All garbage <br /> dumpsters and recycle bins tnust be screened frozn view from the street and from adjacent properties. <br /> This screening may be done using dense vegetation or by placing the dumpster or recycle bin in a <br /> ` structural enclosure. All mechanical equipm.ent, loading and trash collection areas shall be screened <br /> by a com �nation of masonry alls and planting. Sou d buffering should be used to reduce noise <br /> impacts���` �,L `b���� �� `VU 1,.���1 s <br /> � � <br /> �6. This property is located near thc �verett Smelter Site/Asarco cleanup area. Contact the Department of <br /> Ecology for information and requirements, if any, reparding contaminated soil cleanup at: <br /> � ��„< <br /> D,��,�'D' �S ��S � rr�f�• b FINAL MDNS SEPA#t16-008 ��� <br /> � � � ��� _ <br />