My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
>
Address Records
>
BROADWAY
>
931
>
TEUTSCH STUDENT HOUSING
>
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 10:00:50 AM
Creation date
1/17/2018 4:21:42 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
TEUTSCH STUDENT HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> Sandra Matthews, LG, LHG <br /> Site Manager of the Toxics Cleanup Program, NWRO <br /> 3190 160th Ave SE <br /> Bellevue, WA 98008-5452 <br /> 425-649-7206 or at smat461 @ecy.wa.gov <br /> Public Works Comments—Sabrina Fandler—425.257.8810 <br /> l. Construction permits, inspections, and final approvals are required for this project from City of Everett <br /> Permit Services. <br /> 2. A Public Works Perinit is required for this project. Detailcd drawings in accordance with the current <br /> City of F,verett Design and Construction Standards and Specifications for Development shall be <br /> submitted to the Public Works Department, shov��ing site parking layout, landscaping, utilities, storm <br /> drainage, temporary construction erosion and sedimentation control (TESC), and all required <br /> improvements in the public right-of-way. Public Works Department approval of these drawings is <br /> required prior to any permits being issued. All innprovements shall be completed, approved, and <br /> warranted before the Occupancy Permit is issued,/final approval is granted. <br /> 3. The construction plans must be designed from a site survey performed by a licensed State of Washington <br /> la,nd surveyor. <br /> 4. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 5. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 6. On-site water main will be staked within an easement to the City. The easement will be submitted to the <br /> City prior to issuance of permits. <br /> 7. A DCDA is required at every Iire connection into the building. An RPBA is required on the domestic <br /> service and can be located in the Riser Room with a drain. A DCVA is required for irrigation. <br /> 8. Prior to deinolition of the existing building,please physically disconnect the existing water line on the <br /> customer side of the existing 2"tneter and obtain a Utility Permit from City of Everett for a sewer cap- <br /> of.f to cap existing side sewers at the property line. <br /> 9. As long as the student housing project is residential housing only, there will not be a need for <br /> pretreatment. However, if the new facility includes any centralized kitchen facilities other than what is in <br /> each unit, then requirements to install a grease removal system to serve those drains will apply. <br /> 10. Stormwater from the site shall be managed in accordance with the applicable City stormwater <br /> management requirements, including Policy 2-11, unless specifically instructed otherwise by the City. <br /> 11. The existing stormwater infrastructure at the nortli end of the alley, which collects runoff from the alley <br /> and routes it through the existing project's private stormwater system, shall be abandoned. 'The runoff <br /> from the remaining paved portion of the alley shall be handled with on-site stormwater management <br /> _�`' ���. <br /> FINAL MDNS SEPA#16-008 J/N� <br /> / <br />
The URL can be used to link to this page
Your browser does not support the video tag.