Laserfiche WebLink
� � <br /> tneasures at thc n�rth end oFthe allcy, if doing so wot�ld be feasiblc without causin� �,rosion �r Iloodiii�;. <br /> If no other feasible disposal option is found to exist, the runoff from the alley may enter the storm <br /> drainage system of the new project, but only if the City is granted a hold-harmless agreement from the <br /> applicant for potential damage to the private system from the alley runoff. <br /> 12. Stormwater from the project shall be kept separate from the site's sanitary sewage and shall be connected <br /> to the combined sewer main in Broadway in a manner approved by the City. For the drainage connection <br /> to the combined sewer, provide a structure that can be re-connected to the future separated storn7 main. <br /> 13. Current plans indicate that one of the existing sewer stubs is to be reused as a stormwater discharge point. <br /> Please connect to either of the existing stormwater systems at the entrance to the college across <br /> Broadway to the NW of the property or across l Oth St to the SF of the property. <br /> 14. A cleanout is required at the property line per City of Everett Standard Drawing 602 for each side sewer <br /> and storm service drain. <br /> 15. Provide a manhole at the connection to the sewer main. <br /> 16. It is highly advisable that the existing 6-inch concrete side sewer be replaced with a new PVC side sewer. <br /> The c�ondition �f the eYistin� side sewer in thc ri�ht-�f-�va�r is �i�estiotlablc �F�r fl1e l�n�revitv �f t��e <br /> proposed project with high usage at peak hours. Additionally, if trees are going to be planted without a <br /> concrete structural box, then there are chances of roots entering at the connection point between new and <br /> existing side sewers as well as a high likelihood of damage to the side sewer. The new PVC sanitary side <br /> sewei- can be located where needed along the l3roadway combined sewer main or can be connected at the <br /> same location as the existing side sewer to be replaced. <br /> 17. Frontage/roadway/alley/pedestrian/bicycle improvements shall be provided as needed. Frontage <br /> improvements shall extend across the alley driveway. <br /> 18. Any broken or damaged sidewalk/public right-of-way shall be repaired/replaced in accordance with <br /> current City of Everett Standards and per the City Public Works Inspector. <br /> 19. All roadways must meet City of Everett Standards. <br /> 20. All sidewalks and driveways must be ADA compliant. Provide ADA-approved wheel chair ramps at all <br /> crosswalks. <br /> 21. All traffic control markings and devices on driveways within 50' of the right-of-way shall be MUTCD <br /> compliant. <br /> 22. A stop sign must be added to each driveway access point. <br /> 23. Parking layout must be consistent with current City of Everett Standards, including but not limited to <br /> parking aisle widths and parking stall dimensions. <br /> 24. Provide a new street light approximately mid-block along 101h Street between North�3roadway and <br /> Broadway. <br /> b��� l� <br /> FINAL MDNS SEPA#16-008 � / �� <br /> oC <br />