Laserfiche WebLink
' <br /> F�� �py <br /> � <br /> PIJBL/C WORKS <br /> i3.Yµ,� <br /> M�MORANDUM <br /> TO: Cheyenne Thompson, Davido Consulting Group, 206-523-0024 <br /> FROM: Sabrina Fandler, Engineering/Permit Services <br /> DATE: 8-11-2016 <br /> SUBJECT: Plan Review Comments for Public Works Yermit Application <br /> PROPOSAL: New Student Housing for Teui�h Partners/�vCC <br /> LOCATION: 931 Broadway <br /> PERMIT#: PW1607-008 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler�everettwa.�ov. <br /> �l. Plcatic res�ihmit tl�c (i�ll�����ing ilcrns to thc Pcri»it Scrviccs Countcr witl� your <br /> resubmittal once all requested revisions (below and redlines) have been madc: <br /> �i,� Transmittal Sheet: (1) available online at https://everettwa.�ov/Permits or at the <br /> Permit Counter-2"`� Floor, 3200 Cedar Street. <br /> �i. Plans: (4) sets of revised plans plus original City Markups. <br /> iii. . Drainage Report: (2) copies of revised drainage report. <br /> iv. Cost �stimate for Permit Fee Calculation Form: (1) copy of cost estimate form <br /> filled out for the City to use to calculate the Public Works Permit Fee. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm (closed between 12:OOpm-1:OOpm for lunch). <br /> 'b. In gene�ral, the following comments apply: <br /> ',i° On Sheet CO2, please revise note 5's reference to construction entrance to either <br /> read "construction entrance/exit" or"construction access". See redlines. <br /> �i'r: On Sheet CO2, please note that a side sewer utility permit for sewer cap-off must <br /> be obtained from the Permit Services counter prior to any demolition. Please <br /> make a note to this affect somewhere on the plans or key notes. <br /> z�i. On Sheet CO3, please revise key note 13 to specify that water services shall be <br /> capped at the back side (or private side) of the meter rather than anywhere <br /> downstream. <br /> iv< Please fix the legend on each page, as the hatch patterns are missing from all of <br /> ihe paving types. ("l,ypical of every page). <br /> Page 1 of 4 <br />