Laserfiche WebLink
A new public safety building shall be constructed south <br /> of City Hall bordered by Pacific to the south, the <br /> alley to the west and Wetmore to the east. The build- <br /> ing will consist of at least two floors of office space <br /> (with an unfinished third floor for future growth if <br /> funding permits) and three levels of public and private <br /> parking. The building will house the entire Police <br /> Department as well as City Council chambers and City <br /> Council offices. In addition, the City Hall space <br /> vacated by the Police Department shall be remodeled to <br /> house the City court facilities and the Planning <br /> Department. The improvements described in this Section <br /> 2 .A. shall be referred to herein as the "Public Safety <br /> Building Project. " <br /> B. Fire Station Relocations <br /> Fire Station Number 2 shall be relocated from 2801 <br /> Oakes to 37th and Rucker, Fire Station Number 4 shall <br /> be relocated from Forest Park to approximately 60th and <br /> Glenwood, and Fire Station Number 5 shall be relocated <br /> from Madison and Beverly Boulevard to near the I-5 and <br /> S.R. 526 interchange. In addition, a house located <br /> behind Reservoir Number 3 on Evergreen Way will be <br /> replaced with a fire training facility. The improve- <br /> ments described in this Section 2 .B. shall be referred <br /> to herein as the "Fire Department Project. " <br /> C. Library Improvements <br /> The main library shall be expanded by the addition of <br /> approximately 20 , 000 square feet, and 30 , 800 square <br /> feet of the main library shall be remodeled. The <br /> addition shall be located west of the existing library <br /> on recently acquired property. Parking totalling <br /> approximately 31 , 500 square feet will be provided under <br /> JAR79/29 -4- <br />