My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Project Coordination Meetings: HWA will attend up to one (1)project coordination <br /> meeting at Perteet's Everett Office. HWA's attendance will be used to convey the <br /> geotechnical considerations of the site to Everett Transit and the design team. <br /> • Prepare Draft Geotechnical Engineering Report: HWA will prepare a draft geotechnical <br /> engineering report for the project. This report will contain the results of the geotechnical <br /> engineering investigation, including description of surface and subsurface conditions; a site <br /> plan showing exploration locations and other pertinent features; summary boring logs; and <br /> laboratory test results. The report will provide geotechnical recommendations for each of the <br /> proposed improvements. <br /> • Prepare a Final Geotechnical Engineering Report: HWA will finalize our geotechnical <br /> report once we receive review comments from Perteet and the Everett Transit. <br /> Project Management <br /> • Invoice Generation and Processing: HWA will prepare monthly invoices, and progress <br /> reports for the duration of the design phase of the project. <br /> • Geotechnical Task Management: HWA will provide geotechnical task management to all <br /> geotechnical related aspects of the project. HWA will correspond with the City and the <br /> design team in the form of emails, fax, and telephone calls, as necessary. <br /> ASSUMPTIONS <br /> • The geotechnical explorations proposed herein will not be used to assess site <br /> environmental conditions. However,visual or olfactory observations regarding potential <br /> contamination will be noted. Analysis,testing, storage, and handling of potentially <br /> contaminated soil and ground water(either sampled or spoils from drilling)are beyond <br /> this scope of services. If contaminated soils and/or ground water are encountered,the <br /> material will be properly contained on-site for disposal as mutually agreed upon without <br /> additional cost to HWA. <br /> • All non-contaminated drilling spoils and related debris will be drummed on site and <br /> transported off site for disposal by the drilling subcontractor. <br /> • HWA assumes that they will not attend any project coordination meetings other than the <br /> kick off meeting. <br /> • All Field explorations will be conducted between the hours of 8AM to 5PM. <br /> • No Phase 1 or Phase 2 Environmental Site Assessment will be completed by HWA. <br /> • All required rights of entry will be provided by Everett Transit or Perteet at no cost to <br /> HWA. <br /> • Onsite Infiltration will not be used for this project. <br /> • The borehole locations will be surveyed by others. <br /> • The site soils will support standard plan luminaire foundations design. No non-standard <br /> foundation design will be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.