My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Relatively disturbed subsurface soil samples will be collected from the borings using the <br /> Standard Penetration Test(SPT)at intervals of 2.5 feet. <br /> DELIVERABLES <br /> Geotechnical Work Plan Memorandum <br /> Draft and Final Geotechnical Engineering Report <br /> 0.0 <br /> We appreciate the opportunity to provide geotechnical services on this project. Please feel free to <br /> call if you have any questions or need additional information. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> P-cirtierdi 4- 16/,,LA-2?- <br /> Donald <br /> 6' ^- <br /> Donald J. Huling, P.E. <br /> Geotechnical Engineer, Principal <br />
The URL can be used to link to this page
Your browser does not support the video tag.