My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> ISPECIAL PROVISIONS GENERAL CONDITIONS <br /> total cost" calculation, in whole or in part, but instead agrees that any and all requests <br /> for compensation shall be based upon accurate, complete and contemporaneous cost <br /> records that segregate and allocate costs (a) between base Contract Work and the work <br /> for which additional compensation is sought and (b) between each item of work for <br /> which additional compensation is sought. Claims for inefficiency shall only be based <br /> and calculated by a comparison of productivity of similar Work performed in an <br /> unaffected or least affected area of the Project. <br /> 2. No claim for consequential damages of any kind will be allowed. <br /> 9.6 Unabsorbed and Extended Overhead <br /> A. Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be <br /> calculated using the Eichleay formula by: <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's billings to <br /> the Contractor's overall billings during the overall period of the subject Project's <br /> performance. The result is"Allocable Overhead." <br /> a. Any additional and unresolved direct cost claims presented by the Contractor <br /> concurrently with any request for Extended and/or Unabsorbed Overhead shall not be <br /> included in determining the ratio of the subject Project billings to overall Contractor <br /> billings for the period of project performance. <br /> 2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the number of <br /> days (as contractually defined) of Contract performance. The result is the Daily Rate of <br /> Allocable Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office <br /> Overhead due to the project extension. This is accomplished by multiplying the Daily Rate <br /> of Allocable Overhead by the number of days of project extension caused solely by the <br /> Owner. This results in the Gross Amount of Additional Home Office Overhead <br /> Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders that <br /> are being presented and resolved concurrently with the subject calculation for Unabsorbed <br /> and/or Extended Home Office Overhead. The necessary adjustment would be to reduce the <br /> Gross Amount of Additional Home Office Overhead Compensation by any additional <br /> 111, compensation for Overhead included in any direct cost claims being resolved concurrently <br /> with any claim for Extended and/or Unabsorbed Home Office Overhead. <br /> NB. Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.7 Force Account <br /> A. If Work or materials are to be paid for by Force Account, payment amounts will be determined <br /> and Contractor shall contemporaneously prepare, keep and maintain records segregated and <br /> allocated by time, location and item of Work in compliance with this subsection. Such records <br /> must be contemporaneously countersigned by the Owner or the Owner's Representative (or its <br /> designee). Any records not countersigned by the Owner or Owner's Representative shall be <br /> excluded from the calculation of payment under this subsection. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> ' WO#UP3620 00 72 13 -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.