My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> B. The payments provided for herein shall be full payment for all Work done on a Force Account <br /> basis. The payment shall be deemed to cover all expenses of every nature, kind, and description, <br /> 111 <br /> including all Overhead expenses, profit, occupational tax and any other Federal or State revenue <br /> acts, premiums on public liability and property damage insurance policies, and for the use of <br /> small tools and equipment for which no rental is allowed. <br /> C. No Contract Claim for Force Account shall be allowed except upon written order by the Owner's <br /> Representative for Extra Work prior to the performance of the Extra Work. No Extra Work shall <br /> be construed as Force Account Work that can be measured under the Specifications and paid for <br /> at the unit prices or lump sum named in the Contract. <br /> D. The Owner's Representative shall compute the amount and costs of any Work to be paid by Force <br /> Account, and the amount certified by the Owner's Representative shall be final as provided in <br /> 3.2. Owner's Representative. <br /> E. The Contractor's wage, payroll, and cost records pertaining to Work paid for on a Force Account <br /> basis shall be open to inspection or audit as provided in ARTICLE 17. AUDITS. <br /> 9.8 Labor. <br /> A. The Owner will reimburse the Contractor for labor and for supervision by foremen dedicated I <br /> solely to the particular Force Account item of Work, but not for supervision by general <br /> superintendents or general foremen. The Owner's Representative will compute the labor payment <br /> on the basis of these four factors: <br /> 1. Weighted Wage Rate <br /> a. A Weighted Wage Rate shall be computed for each classification of labor used. This <br /> rate shall reflect the Contractor's actual cost. It shall neither exceed what is normally 111 <br /> paid to comparable labor nor fall below the minimum required by 7.1. Wages Of <br /> Employees. If the Owner's Representative authorizes overtime, the Weighted Wage <br /> Rate shall be determined on the same basis. <br /> 1) The Weighted Wage Rate combines: <br /> a) the current basic wage and fringe benefits the Contractor is required and has <br /> agreed to pay, I <br /> b) Federal Insurance Compensation(FICA), <br /> c) Federal Unemployment Tax Act(FUTA), and <br /> d) State Unemployment Tax Act(SUTA) <br /> 2. Travel Allowance and Subsistence <br /> a. This includes the actual costs of allowances for travel or subsistence paid to employees <br /> in the course of their work on the item. This reimbursement will be made only if such <br /> allowances are required by a regional labor agreement or are normally paid by the <br /> Contractor to comparable labor for performing other work. <br /> 3. Industrial Insurance and Medical Aid Premiums I, <br /> a. The Owner will reimburse Contractor-paid premiums for Marine Industrial Insurance, <br /> for State of Washington Industrial Insurance, and Medical Aid Premiums that become <br /> an obligation of the Contractor and are chargeable to the Force Account Work. The <br /> Owner will not pay the Contractor for Medical Aid premiums that are paid by the <br /> employees. <br /> 4. Overhead and Profit I <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.