My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. The submitting, orderingand deliveryof materials that have that have longlead times <br /> ensuring that the Work can be completed within the Contract Time. <br /> 4. Schedule of temporary bypass pumping and estimated duration. Submit a detailed plan for <br /> conveying sewage to the downstream collection system during temporary bypass pumping. <br /> 5. Listing of equipment to be present on site, including temporary pumping equipment to be <br /> used to bypass sewage. <br /> 6. Assistance to be required of Owner's operating personnel during any work activities. <br /> 7. Contingency plan identifying what action will be taken if activities during bypass pumping • <br /> cannot be completed within the allotted times,or if there is a failure of pumping equipment <br /> to be used during temporary pumping operations. <br /> 8. Name and contact information of individual in charge of activity during bypass pumping. I <br /> 1.3 PROJECT SPECIFIC WORK CONSTRAINTS <br /> A. Contractor shall phase the work to ensure an orderly sequencing of activities with minimum <br /> disturbance to the adjacent active golf course operations <br /> B. The Contractor shall schedule their work as required to: <br /> 1 <br /> 1. Complete all stormwater and utility installations prior to the finishing stage of the golf <br /> course. <br /> 2. Complete installation of stormwater piping for connection to the future upstream <br /> conveyance system prior to May 15, 2018. 1 <br /> 3. Complete the installation of all golf scape areas requiring grassing by August 2018. <br /> 4. Complete the installation of the stormwater piping and ponds so they are functional and I <br /> ready to receive stormwater flow by July 2018. <br /> 5. Complete the installation of the stormwater piping and all restoration within the Everett 1 <br /> Community College easement and temporary construction easement in a period of not <br /> more than 60 days. <br /> C. The Contractor shall phase all construction activities to ensure golf play may continue <br /> uninterrupted during normal golf course operating hours per the Interim Routing Plan <br /> contained herein. 1 <br /> D. The Contractor shall phase all topsoil operations, shaping, feature construction, finishing and <br /> planting per Division 32 of these Specifications, Golf Course Specifications. I <br /> 1.4 GENERAL WORK CONSTRAINTS <br /> A. Constraints primarily relate to interfacing with and tying into existing pipelines,power supply, I <br /> equipment, and other aspects of the operating pump station facility. <br /> Legion Golf Course Stormwater Detention Project Work Sequence I <br /> WO#UP3620 01 12 16-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.