I <br /> 3. The submitting, orderingand deliveryof materials that have that have longlead times <br /> ensuring that the Work can be completed within the Contract Time. <br /> 4. Schedule of temporary bypass pumping and estimated duration. Submit a detailed plan for <br /> conveying sewage to the downstream collection system during temporary bypass pumping. <br /> 5. Listing of equipment to be present on site, including temporary pumping equipment to be <br /> used to bypass sewage. <br /> 6. Assistance to be required of Owner's operating personnel during any work activities. <br /> 7. Contingency plan identifying what action will be taken if activities during bypass pumping • <br /> cannot be completed within the allotted times,or if there is a failure of pumping equipment <br /> to be used during temporary pumping operations. <br /> 8. Name and contact information of individual in charge of activity during bypass pumping. I <br /> 1.3 PROJECT SPECIFIC WORK CONSTRAINTS <br /> A. Contractor shall phase the work to ensure an orderly sequencing of activities with minimum <br /> disturbance to the adjacent active golf course operations <br /> B. The Contractor shall schedule their work as required to: <br /> 1 <br /> 1. Complete all stormwater and utility installations prior to the finishing stage of the golf <br /> course. <br /> 2. Complete installation of stormwater piping for connection to the future upstream <br /> conveyance system prior to May 15, 2018. 1 <br /> 3. Complete the installation of all golf scape areas requiring grassing by August 2018. <br /> 4. Complete the installation of the stormwater piping and ponds so they are functional and I <br /> ready to receive stormwater flow by July 2018. <br /> 5. Complete the installation of the stormwater piping and all restoration within the Everett 1 <br /> Community College easement and temporary construction easement in a period of not <br /> more than 60 days. <br /> C. The Contractor shall phase all construction activities to ensure golf play may continue <br /> uninterrupted during normal golf course operating hours per the Interim Routing Plan <br /> contained herein. 1 <br /> D. The Contractor shall phase all topsoil operations, shaping, feature construction, finishing and <br /> planting per Division 32 of these Specifications, Golf Course Specifications. I <br /> 1.4 GENERAL WORK CONSTRAINTS <br /> A. Constraints primarily relate to interfacing with and tying into existing pipelines,power supply, I <br /> equipment, and other aspects of the operating pump station facility. <br /> Legion Golf Course Stormwater Detention Project Work Sequence I <br /> WO#UP3620 01 12 16-2 <br />