My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • connecting to existing pipe and structures, <br /> • furnishing,placing and compacting suitable native backfill material, <br /> • cleaning,flushing, inspecting, and testing, <br /> • reconnecting existing sewer connections, <br /> • adjusting all manhole rings and covers to final grade, <br /> • channeling manhole base. <br /> 13. Sewage Diversion I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all labor, materials, excavation, pumping I <br /> equipment, temporary piping and fittings, backfilling temporary excavations required to provide for the <br /> uninterrupted flow of wastewater in the existing sewer system as defined in Section 01 57 19.11. The lump <br /> sum price shall also include all costs associated with furnishing and removal of temporary protective <br /> facilities, security or construction fencing and restoring service/diverting flows to the constructed facilities <br /> upon completion of the replacement work. The lump sum price shall include submittal and approval of a <br /> Temporary Sewage Control and Bypass Pumping Plan for each location addressing flows, pumps and <br /> overland piping setups. <br /> 14. Abandon Existing Manhole <br /> Measurement and Payment: Each <br /> The unit price bid per each shall constitute full compensation for all material,labor and equipment,complete <br /> and in place, for work necessary to abandon the sewer manholes shown on the plans. Included in, but not <br /> limited to,the unit price for this item are all costs for: <br /> • excavation, <br /> • stockpiling excavated material, <br /> • protecting and/or maintaining existing utilities, <br /> • Salvage existing manhole frame and cover and deliver to Owner's shop, <br /> • removing and disposing of existing manhole to the required elevations, <br /> • abandoning existing pipe that is no longer in service, <br /> • furnishing,placing and compacting suitable native backfill material. <br /> 15. Unsuitable Foundation Excavation and Backfill <br /> Measurement and Payment: Cubic Yard <br /> The unit price bid per cubic yard shall constitute full compensation for all material, labor and equipment to <br /> remove and dispose unsuitable foundation material and replace with suitable backfill material as authorized <br /> by the Owner's Representative. Included in,but not limited to,the unit price for this item are all costs for: <br /> • excavating and disposing of unsuitable foundation material on site at a location determined by the <br /> Owner's Representative, <br /> • furnishing and placing grade separation fabric prior to placing backfill material, <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment I <br /> WO#UP3620 01 22 00-6 <br />