Laserfiche WebLink
I <br /> • furnishing,placing and compacting gravel borrow, or other approved backfill material, <br /> Measurement shall be computed in the field by estimating material removed. <br /> 16. Storm Sewer Pipe, 18-inch Diameter,Polyethylene <br /> 17. Storm Sewer Pipe,24-inch Diameter,Polyethylene <br /> 18. Storm Sewer Pipe, 18-inch Diameter, Class IV Reinforced Concrete <br /> 19. Storm Sewer Pipe,24-inch Diameter,Class IV Reinforced Concrete <br /> 20. Storm Sewer Pipe,30-inch Diameter, Class III Reinforced Concrete <br /> Measurement and Payment: Linear Foot <br /> The unit price bid per linear foot shall constitute full compensation for all material, labor and equipment, <br /> complete and in place and at grades specified in the plans, for all work to furnish and install storm sewer <br /> pipe. Measurement and Payment for storm drain laid and tested per WSDOT 7-04.3(1)shall be made along <br /> the pipe, through fittings and structures. Included in,but not limited to, the unit price for this item are all <br /> costs for: <br /> • clearing and disposal of vegetative debris, <br /> • trench excavation, <br /> • stockpiling excavated material, <br /> • protecting and/or maintaining existing utilities, <br /> • removing and disposing of existing piping and fittings, <br /> • furnishing,placing and compacting pipe bedding and pipe zone material, <br /> • furnishing and installing pipe,bends and fittings, <br /> • furnishing,placing and compacting suitable native backfill material, <br /> • cleaning, flushing,inspecting, and testing, <br /> • furnishing and installing all necessary fittings, coupling and appurtenances, <br /> • abandoning existing pipe that is no longer in service when encounter. • <br /> 21. Pond Excavation and Earthwork,North Detention Pond(Existing) <br /> 22. Pond Excavation and Earthwork, South Detention Pond <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all equipment,material,labor,tools,and incidentals <br /> required to excavate for the detention ponds and place material in accordance with the golf course earthwork <br /> requirements. Included in,but not limited to,the lump sum price for this item are all costs for: <br /> • draining existing ponds(North Detention Pond), <br /> • removing vegetation and excavating organic soils from existing ponds, (North Detention Pond) <br /> • excavating to the necessary lines and grades, <br /> • excavating to accommodate pipe,pipe end protection,pond access,pond walls, <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 012200 - 7 <br />