I
<br /> • furnishing,placing and compacting gravel borrow, or other approved backfill material,
<br /> Measurement shall be computed in the field by estimating material removed.
<br /> 16. Storm Sewer Pipe, 18-inch Diameter,Polyethylene
<br /> 17. Storm Sewer Pipe,24-inch Diameter,Polyethylene
<br /> 18. Storm Sewer Pipe, 18-inch Diameter, Class IV Reinforced Concrete
<br /> 19. Storm Sewer Pipe,24-inch Diameter,Class IV Reinforced Concrete
<br /> 20. Storm Sewer Pipe,30-inch Diameter, Class III Reinforced Concrete
<br /> Measurement and Payment: Linear Foot
<br /> The unit price bid per linear foot shall constitute full compensation for all material, labor and equipment,
<br /> complete and in place and at grades specified in the plans, for all work to furnish and install storm sewer
<br /> pipe. Measurement and Payment for storm drain laid and tested per WSDOT 7-04.3(1)shall be made along
<br /> the pipe, through fittings and structures. Included in,but not limited to, the unit price for this item are all
<br /> costs for:
<br /> • clearing and disposal of vegetative debris,
<br /> • trench excavation,
<br /> • stockpiling excavated material,
<br /> • protecting and/or maintaining existing utilities,
<br /> • removing and disposing of existing piping and fittings,
<br /> • furnishing,placing and compacting pipe bedding and pipe zone material,
<br /> • furnishing and installing pipe,bends and fittings,
<br /> • furnishing,placing and compacting suitable native backfill material,
<br /> • cleaning, flushing,inspecting, and testing,
<br /> • furnishing and installing all necessary fittings, coupling and appurtenances,
<br /> • abandoning existing pipe that is no longer in service when encounter. •
<br /> 21. Pond Excavation and Earthwork,North Detention Pond(Existing)
<br /> 22. Pond Excavation and Earthwork, South Detention Pond
<br /> Measurement and Payment: Lump Sum
<br /> The lump sum bid shall constitute full compensation for all equipment,material,labor,tools,and incidentals
<br /> required to excavate for the detention ponds and place material in accordance with the golf course earthwork
<br /> requirements. Included in,but not limited to,the lump sum price for this item are all costs for:
<br /> • draining existing ponds(North Detention Pond),
<br /> • removing vegetation and excavating organic soils from existing ponds, (North Detention Pond)
<br /> • excavating to the necessary lines and grades,
<br /> • excavating to accommodate pipe,pipe end protection,pond access,pond walls,
<br /> Legion Golf Course Stormwater Detention Project Measurement and Payment
<br /> WO#UP3620 012200 - 7