I <br /> • hauling and placing excavated material in accordance with the golf course earthwork plans and <br /> specifications, <br /> • protecting and/or maintaining existing utilities, I <br /> • removing and disposing of abandon 36-inch sewer and stormwater/drainage piping and structures, <br /> • protecting existing active drainage piping and connecting to new drainage system, <br /> • abandoning existing pipe that is no longer in service when encounter. I <br /> 23. Control Structure System North Detention Pond <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for furnishing and installing the North Detention Pond 1I <br /> Control Structure System consisting of an 84-inch and 60-inch diameter manhole structures with control <br /> features. The unit price shall include all labor, materials and equipment necessary for its construction, <br /> located at the North Pond as shown on the plans. Included in, but not limited to,the lump sum price for <br /> this item are all costs for: <br /> • excavation, <br /> • stockpiling excavated material, <br /> • protecting and/or maintaining existing utilities, <br /> • removing and disposing of existing piping and materials, I <br /> • furnishing,placing and compacting bedding material, <br /> • furnishing and installing two control structures, <br /> • grout fill within the structures I <br /> • furnishing and installing pipe connections, <br /> • furnishing,placing and compacting suitable native backfill material, <br /> • cleaning, flushing, inspecting, and testing, <br /> • furnishing and installing features associated with the 84-inch structure, including, but not <br /> limited to: <br /> o design and construction of a reinforced concrete baffle wall, <br /> o piping, fittings, orifice plates, gate valves and appurtenances, <br /> o trash rack cover <br /> • furnishing and installing features associated with the 60-inch structure, including, but not <br /> limited to: <br /> o canal gate and flap gate, <br /> o ductile iron spools and transition couplings, <br /> o cover with access hatch <br /> 24. Control Structure System South Detention Pond I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for furnishing and installing the South Detention Pond <br /> Control Structure System consisting of an 84-inch and 60-inch diameter manhole structures with control <br /> features. The unit price shall include all labor, materials and equipment necessary for its construction, <br /> located at the South Pond as shown on the plans. Included in, but not limited to, the lump sum price for <br /> this item are all costs for: <br /> I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 012200-8 <br />