My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> If the Contractor requests that more than one (1) copy of the reviewed submittal be returned, 111 <br /> then the Contractor shall submit the appropriate quantity of submittals. <br /> I. For each submittal for review, allow not less than 14 working days for Engineer review, <br /> excluding delivery time to and from Contractor. <br /> J. Identify variations in Contract Documents and product or system limitations that may be <br /> detrimental to successful performance of completed Work. <br /> K. Allow space on submittals for Contractor and Engineer review stamps or comments. ! <br /> L. When revised for resubmission, the Contractor shall identify changes made since previous <br /> submission. A narrative of changes shall be provided,and shop drawings or calculations shall 1 <br /> indicate that a revision was made. <br /> M. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report <br /> inability to comply with requirements. <br /> N. Submittals not requested will not be recognized nor processed. <br /> O. Incomplete Submittals: Engineer will not review. Complete submittals for each item are <br /> required. Delays resulting from incomplete submittals are not the responsibility of Engineer. <br /> 1.6 PRODUCT DATA <br /> A. Product Data:Action Submittal: Submit to Engineer for review for assessing conformance with <br /> information given and design concept expressed in Contract Documents. Submitted data shall <br /> be sufficient in detail for determination of compliance with the Contract Documents. <br /> B. Mark each copy to identify applicable products, models, options, and other data. Supplement I' <br /> manufacturers'standard data to provide information specific to this Project. <br /> 1. Note submittal will be returned to Contractor without review of submittal if products, I <br /> models,options and other data are not clearly marked or identified. <br /> • <br /> C. Indicate product utility and electrical characteristics, utility connection requirements, and <br /> location of utility outlets for service for functional equipment and appliances. <br /> D. After review, produce copies and distribute according to "Submittal Procedures" Article and <br /> for record documents. <br /> 1.7 SHOP DRAWINGS <br /> A. Shop Drawings: Action Submittal: Submit to Engineer for assessing conformance with <br /> information given and design concept expressed in Contract Documents. <br /> B. Indicate special utility and electrical characteristics, utility connection requirements, and <br /> location of utility outlets for service for functional equipment and appliances. <br /> C. When required by individual Specification Sections,provide Shop Drawings signed and sealed <br /> by a professional Engineer licensed in the state of Project responsible for designing <br /> components shown on Shop Drawings. I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures <br /> WO#UP3620 01 33 00 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.