My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1. Include signed and sealed calculations to support design. <br /> 2. Submit Shop Drawings and calculations in form suitable for submission to and approval <br /> by authorities having jurisdiction. <br /> 3. Make revisions and provide additional information when required by authorities having <br /> jurisdiction. <br /> D. All dimensioned shop drawings shall be scalable and provided as full-sized(22"x 34") sheets. <br /> PDF electronic files shall print as scalable full-sized sheets. <br /> E. After review, produce copies and distribute according to "Submittal Procedures" Article and <br /> for record documents. <br /> 1.8 SAMPLES <br /> A. Samples: Action Submittal: Submit to Engineer for assessing conformance with information <br /> given and design concept expressed in Contract Documents. <br /> B. Samples for Selection as Specified in Product Sections: <br /> I1. Submit to Engineer for aesthetic, color, and finish selection. <br /> 2. Submit Samples of finishes,textures, and patterns for Owner selection. <br /> C. Submit Samples to illustrate functional and aesthetic characteristics of products, with integral <br /> parts and attachment devices. Coordinate Sample submittals for interfacing work. <br /> D. Include identification on each Sample, with full Project information. <br /> E. Submit number of Samples specified in individual Specification Sections; Engineer will retain <br /> one Sample. <br /> F. Reviewed Samples that may be used in the Work are indicated in individual Specification <br /> Sections. <br /> G. After review, produce copies and distribute according to "Submittal Procedures" Article and <br /> for record documents. <br /> 1.9 DESIGN DATA <br /> A. Informational Submittal: Submit data for Engineer's knowledge as Contract administrator or <br /> for Owner. <br /> B. Submit information for assessing conformance with information given and design concept <br /> expressed in Contract Documents. <br /> 1.10 TEST REPORTS <br /> A. Informational Submittal: Submit reports for Engineer's knowledge and records as Contract <br /> administrator or for Owner. <br /> I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures <br /> WO#UP3620 013300 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.