My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 <br /> B. Submit test reports for information for assessing conformance with information given and <br /> design concept expressed in Contract Documents. <br /> 1.11 CERTIFICATES <br /> A. Informational Submittal: Submit certification by manufacturer, installation/application <br /> Subcontractor,or Contractor to Engineer, in quantities specified for Product Data. <br /> B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting <br /> reference data,affidavits,and certifications as appropriate. <br /> C. Certificates may be recent or previous test results on material or product but must be acceptable <br /> to Engineer. <br /> 1.12 MANUFACTURER'S INSTRUCTIONS <br /> A. Informational Submittal: Submit manufacturer's installation instructions for Engineer's I <br /> knowledge as Contract administrator or for Owner. <br /> B. Submit printed instructions for delivery,storage, assembly,installation, startup,adjusting,and <br /> finishing,to Engineer in quantities specified for Product Data. <br /> C. Indicate special procedures, perimeter conditions requiring special attention, and special I <br /> environmental criteria required for application or installation. <br /> 1.13 MANUFACTURER'S FIELD REPORTS I <br /> A. Informational Submittal: Submit reports for Engineer's knowledge and records as Contract <br /> administrator or for Owner. <br /> B. Submit report within 48 hours of observation to Engineer for information. <br /> C. Submit reports for information for assessing conformance with information given and design i <br /> concept expressed in Contract Documents. <br /> 1.14 ERECTION DRAWINGS I <br /> A. Informational Submittal: Submit Drawings for Engineer's knowledge and records as Contract <br /> administrator or for Owner. I <br /> B. Submit Drawings for information assessing conformance with information given and design <br /> concept expressed in Contract Documents. <br /> C. Data indicating inappropriate or unacceptable Work may be subject to action by Engineer or <br /> Owner. I <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures I <br /> WO#UP3620 01 33 00-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.