My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 5. Submit copies of licenses, certifications, correspondence, records and similar documents <br /> used to establish compliance with standards and regulations that pertain to performance of <br /> the Work to the OWNER,ENGINEER and Special Inspectors. <br /> 6. Where Special Inspection requires pre-construction testing for compliance with specified <br /> requirements for performance and test methods, comply with the following: <br /> a. Provide test specimens representative of proposed products and construction in a <br /> timely manner with sufficient time for testing and analyzing results to prevent delaying <br /> the Work. <br /> b. Provide information on configurations of test assemblies, testing procedures and <br /> laboratory test records to adequately demonstrate capability of products to comply with <br /> performance requirements. <br /> 7. Cooperate with Agencies performing required tests,special inspections and similar quality <br /> control services. Notify Agencies in advance of operations to permit assignment of <br /> personnel. Provide the following: <br /> a. Access to the Work. <br /> b. Incidental labor, equipment and materials necessary to facilitate tests and special <br /> inspections. <br /> c. Adequate quantities of representative samples of materials that require testing and <br /> inspecting. Assist Agencies in obtaining samples. <br /> d. Provide facilities for storage and field curing of test samples. <br /> e. Deliver samples to Testing Agencies. <br /> 8. Coordinate sequence of activities to accommodate required quality-assurance and control <br /> services with a minimum of delay and to avoid necessity of removing and replacing <br /> construction to accommodate testing and special inspecting. <br /> 9. Schedule times for tests, special inspections, obtaining samples and similar activities. <br /> Distribute schedule to OWNER, ENGINEER, Special Inspectors, Testing Agencies and <br /> each party involved in portions of the work where tests and special inspections are required. <br /> 1.5 SUBMITTALS <br /> ' A. Laboratory Test or Inspection Reports <br /> Each report shall be signed and certified by the independently owned and operated testing <br /> ' laboratory. Unless otherwise specified, submit three (3) copies of each report to the OWNER <br /> or OWNER's REPRESENTATIVE. <br /> PART 2 PRODUCTS <br /> NOT USED <br /> 111 <br /> Legion Golf Course Stormwater Detention Project Quality Control <br /> WO#UP3620 0145 00- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.