Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PART 3 EXECUTION <br /> 3.1 FIELD TESTING SCHEDULE 1 <br /> A. The CONTRACTOR shall complete field testing in accordance with the following schedule <br /> and applicable standards.Additional source material testing shall be completed as necessary to <br /> establish the basis of field tests. The frequency of testing listed in this schedule lists the <br /> minimum number of tests per quantity of work completed by the CONTRACTOR. Testing <br /> locations to be determined by the ENGINEER. ' <br /> Payment <br /> material to be <br /> Tested Responsibility or: .. . Minimum TestingiFrequency <br /> , Anitial Testing.: ' <br /> In-place compaction testing(w/nuclear compaction <br /> gage)performed at 2-foot elevation increments, one test I <br /> Structural Backfill OWNER per 2,500 sf of material placed. See Article 3.5, Field <br /> Quality Control of Section 31 23 17,Trenching for <br /> further details on testing requirements. , <br /> In-place compaction testing(w/nuclear compaction <br /> gage)performed at 2-foot elevation increments, one test <br /> per 200 lineal feet of pipeline trench as measured along <br /> Trench Backfill OWNER pipe centerline. ENGINEER may reduce frequency to <br /> one test per lift for every 1,500 lineal feet of pipeline <br /> trench when satisfied with CONTRACTOR's method of <br /> compaction. See Article 3.16, Field Quality Control of <br /> Section 31 23 17,Trenching for further details. <br /> As required when placed. See detailed requirements in I <br /> Asphalt Concrete OWNER Article 1.04, Quality Assurance of Section 32 12 16.13, <br /> Asphalt Paving. I <br /> Material torbe Payment <br /> Minimum Testing Frequency <br /> Tested Responsibility ' <br /> Concrete OWNER As required when placed. See detailed requirements in <br /> Section 03 11 00, Concrete Work. — I <br /> Waterline— As required. See Section 33 13 00,Testing& <br /> Hydrostatic testing CONTRACTOR I <br /> and disinfection Disinfection of Water Utility Piping. <br /> Sanitary and Storm As required. See Section 33 01 30.13, Sewer and <br /> Utility Piping, CONTRACTOR Manhole Testing , <br /> Manholes <br /> END OF SECTION <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Quality Control 1 <br /> WO#UP3620 01 45 00 -4 <br />