Laserfiche WebLink
I <br /> PART 3 EXECUTION <br /> 3.1 FIELD TESTING SCHEDULE 1 <br /> A. The CONTRACTOR shall complete field testing in accordance with the following schedule <br /> and applicable standards.Additional source material testing shall be completed as necessary to <br /> establish the basis of field tests. The frequency of testing listed in this schedule lists the <br /> minimum number of tests per quantity of work completed by the CONTRACTOR. Testing <br /> locations to be determined by the ENGINEER. ' <br /> Payment <br /> material to be <br /> Tested Responsibility or: .. . Minimum TestingiFrequency <br /> , Anitial Testing.: ' <br /> In-place compaction testing(w/nuclear compaction <br /> gage)performed at 2-foot elevation increments, one test I <br /> Structural Backfill OWNER per 2,500 sf of material placed. See Article 3.5, Field <br /> Quality Control of Section 31 23 17,Trenching for <br /> further details on testing requirements. , <br /> In-place compaction testing(w/nuclear compaction <br /> gage)performed at 2-foot elevation increments, one test <br /> per 200 lineal feet of pipeline trench as measured along <br /> Trench Backfill OWNER pipe centerline. ENGINEER may reduce frequency to <br /> one test per lift for every 1,500 lineal feet of pipeline <br /> trench when satisfied with CONTRACTOR's method of <br /> compaction. See Article 3.16, Field Quality Control of <br /> Section 31 23 17,Trenching for further details. <br /> As required when placed. See detailed requirements in I <br /> Asphalt Concrete OWNER Article 1.04, Quality Assurance of Section 32 12 16.13, <br /> Asphalt Paving. I <br /> Material torbe Payment <br /> Minimum Testing Frequency <br /> Tested Responsibility ' <br /> Concrete OWNER As required when placed. See detailed requirements in <br /> Section 03 11 00, Concrete Work. — I <br /> Waterline— As required. See Section 33 13 00,Testing& <br /> Hydrostatic testing CONTRACTOR I <br /> and disinfection Disinfection of Water Utility Piping. <br /> Sanitary and Storm As required. See Section 33 01 30.13, Sewer and <br /> Utility Piping, CONTRACTOR Manhole Testing , <br /> Manholes <br /> END OF SECTION <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Quality Control 1 <br /> WO#UP3620 01 45 00 -4 <br />