My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 56 39 - TEMPORARY TREE AND PLANT PROTECTION <br /> PART 1 GENERAL <br /> 1.1 SUMMARY <br /> 111 A. This Section includes provisions for temporary protection of trees and other plant life in <br /> preparation for Work. <br /> B. This specification shall be applied concurrently and in conjunction with other plant material <br /> protection measures herein described and specified. <br /> PART 2 MATERIALS -Not Used <br /> PART 3 EXECUTION <br /> 3.1 INSPECTION <br /> A. Inspect all trees specified on the Drawings for protection prior to construction. <br /> ' B. Accommodate inspection of tree and exposed roots by a City provided arborist. <br /> C. Verify all conditions on the Drawings with actual conditions at Site regarding tree protection <br /> 1 prior to any site disturbance. <br /> D. The ENGINEER must be present during demolition of existing conditions occurring within the <br /> drip line of trees designated to remain. <br /> E. Notify ENGINEER 24 hours prior to inspections and/or tagging of protected trees. <br /> i3.2 PROTECTION <br /> A. Install barricades specified in the Drawings at drip lines of trees designated to remain prior to <br /> the commencement of construction. <br /> B. Clearly designate protected trees and clear of any material storage, personnel, or vehicular <br /> movement. <br /> ' C. Provide temporary fencing, barricades, and guards as necessary or required to protect trees <br /> designated on the Drawings to remain, from damage above and below grade. <br /> D. Protect root systems of trees and plant life to remain. <br /> 1. Protect from damage due to noxious materials in solution caused by runoff or spillage <br /> during mixing and placement of construction materials. <br /> 2. Protect from flooding, erosion, or excessive wetting resulting from dewatering operations <br /> and compaction. <br /> Legion Golf Course Stormwater Detention Project Temporary Tree&Plant Protection <br /> WO#UP3620 01 56 39- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.