My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> F. Provide adequate space for the electrical installation,including but not limited to,determination <br /> of access-ways and doorways, shipping sections,wall and floor space, and space occupied <br /> by mechanical equipment. Provide electrical equipment that fits in the areas shown on the <br /> drawings. All equipment shall be readily accessible for maintenance, shall have electrical <br /> clearances in accordance with NEC and shall be installed in locations that will provide <br /> adequate cooling. , <br /> G. Check electrical equipment prior to installation so that defective equipment is not installed. <br /> Acceptance testing for electrical equipment shall be performed as discussed in Section <br /> 16921. <br /> H. Provide start-up,follow-up and training of the Owner's personnel for electrical systems. Make <br /> all corrective measures required during start-up. See specific requirements for training and <br /> start-up in other specification sections. <br /> I. Provide field services of qualified technicians to supervise and check out the installation of the <br /> equipment, to supervise and check out interconnecting wiring, to conduct start-up of <br /> operation of the equipment, and to correct any problems,which occur during start-up. <br /> J. Provide circuit breakers, conduit, wire and installation for all items, which require 120 VAC , <br /> power. <br /> K. Provide demolition of existing equipment per specification section 16011. <br /> L. The transfer switches, RTU's, control panels, and instrumentation shall be supplied through <br /> the Control System Integrator I <br /> 1.3 EQUIPMENT COORDINATION <br /> A. The Contractor is responsible to coordinate the equipment supplied from various I <br /> manufacturers. This includes but is not limited to: <br /> 1. Obtaining specific information on equipment ratings and sizes and verifying the <br /> electrical components supplied meet, or match the requirements such as voltage, <br /> phase, frequency, starter types, etc. <br /> 111 <br /> 2. Verifying the equipment supplied will fit within the space allocated. <br /> 3. Coordination of equipment and the electrical power and control requirements. I <br /> Provided in all sections of the specifications and drawings. <br /> 4. Providing power and control equipment, wiring, and raceways to meet the <br /> requirements of the mechanical equipment supplied. <br /> 5. Providing all necessary control wiring and components for any special <br /> 111 <br /> requirements from an equipment manufacturer. <br /> B. The Contractor shall verify as a minimum: <br /> 1. Correct voltage,phase and frequency <br /> 2. Size and space requirements I <br /> Legion Golf Course Stormwater Detention Project Electrical General I <br /> WO#UP3620 26 00 00-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.