My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. Mounting requirements <br /> 1 4. Correct motor starter type <br /> 5. Proper coordination with the controls and control system Integrator. <br /> C. Any discrepancies between the electrical and other equipment shall be brought to the <br /> immediate attention of the Engineer. <br /> D. Selective Coordination: For legally required standby power systems the contactor shall provide <br /> a selectively coordinated power system of fuses or breakers. The design on the plans may <br /> be altered if submitted with documentation that shows that the system is selectively <br /> coordinated. <br /> 1.4 PROJECT DESCRIPTION: <br /> A. In general the project consists of providing and installing three aeration systems, one at each <br /> pond. <br /> B. The following statements highlight the main portion of the electrical work: <br /> 1. Coordinate with SNO PUD to provide new service. <br /> 2. Provide power to three aeration units. <br /> 1 1.5 STANDARDS AND CODES: <br /> A. Permits, licenses,approvals and other arrangements for work shall be obtained and paid for by <br /> the Contractor and included in the bid price. <br /> B. Electrical work shall be executed in strict accordance with the latest edition of the National <br /> Electrical Code and local ordinances and regulations. <br /> 1. All electrical equipment, materials, construction methods, tests and definitions <br /> shall be in strict conformity with the established standards of the following in their <br /> latest adopted revision: <br /> 2. Underwriters'Laboratories, Inc. (UL) <br /> 3. National Electrical Manufacturers Association(NEMA) <br /> 4. Canadian Standards Association(CSA) <br /> 5. Electrical Testing Laboratories(ETL) <br /> 1 6. Factory Mutual(FM) <br /> C. All materials and equipment specified herein shall, within the scope of UL Examination <br /> Services,be approved by the Underwriter's Laboratories for the purpose for which they are <br /> used and shall bear the UL label. <br /> I <br /> Legion Golf Course Stormwater Detention Project Electrical General <br /> WO#UP3620 260000 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.