Laserfiche WebLink
1 <br /> I <br /> D. Landscaped Areas: <br /> 1. When any portion of the Work crosses private property or landscaped areas, excavate <br /> topsoil separately and pile it on the opposite side of the trench from the subsoil. <br /> 2. Conduct Work in a manner that will restore original conditions as nearly as practicable. <br /> 3. Remove and replace any trees, shrubs, plants, sod or other vegetative material as needed <br /> to complete Work. <br /> 4 All shrubs or plants shall be balled by experienced workers, carefully handled and <br /> watered, and replaced in their original positions without damage. Sod shall be handled in <br /> a similar manner. <br /> 5. Wherever sod cannot be saved and restored, the ground must be reseeded and cared for <br /> until a stand of grass is reestablished. <br /> 6. Plants or shrubs killed or destroyed shall be replaced and paid for by the Contractor. I <br /> 7. It is the intent of this paragraph that the Contractor shall leave the surface and plantings <br /> in substantially the same conditions as before the Work isundertaken. J <br /> E. Miscellaneous Site Features: Protect all existing miscellaneous site features from damage by <br /> excavating equipment and vehicular traffic, including but not limited to existing structures, <br /> fences,mailboxes, sidewalks,paving, and curbs. <br /> F. Repair and Replacement: <br /> 1. Damaged items, including but not restricted to those noted above, shall be repaired or <br /> replaced with new materials as required to restore damaged items or surfaces to a <br /> condition equal to and matching that existing prior to damage or start of work of this <br /> contract. <br /> 2. Any damage to existing facilities or utilities to remain as caused by the Contractor's I <br /> operations shall be repaired at the Contractor's expense. <br /> 3.5 LIMITS I <br /> A. As follows,but not to extend beyond the Limits of Construction <br /> 1. Excavation: 5 feet beyond top of cut slopes. <br /> 2. Trench Excavation:6 feet from trench centerline,regardless of actual trench width. I <br /> 3. Fill: <br /> a. Clearing and Grubbing: 5 feet beyond toe of permanent fill. <br /> b. Stripping: 2 feet beyond toe of permanent fill. <br /> 4. Structures: 15 feet outside of new structures. <br /> Legion Golf Course Stormwater Detention Project Site Clearing I <br /> WO#UP3620 311000-4 <br />