Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1.3 SUBMITTALS <br /> A. Section 01 33 00, Submittals - Submittal Procedures: Requirements for submittals. , <br /> B. Excavation Support Systems <br /> 1. Plans and details for trench and excavation support systems. <br /> a. Shop drawings and supporting calculations shall meet the specified design criteria <br /> requirements and include the following: <br /> 1) Arrangement, size and details for individual excavation support system. <br /> 2) Construction methods and sequencing to be used for the installation and removal <br /> of each excavation support system. <br /> 3) Contingency plan for alternative procedures to be implemented if the excavation <br /> support system is found to perform unfavorably or if obstructions are <br /> encountered in the installation. <br /> 2. Provide for Engineer review prior to the beginning of construction activities requiring <br /> such systems. <br /> 3. No excavations shall be started until the submittal review is complete. <br /> 4. Review by the Engineer of the submitted design shall not be construed as a detailed , <br /> analysis of the adequacy of the support system, nor shall any provisions of the above <br /> requirements be construed as relieving overall responsibility and liability for the work. <br /> 1.4 QUALITY ASSURANCE ' <br /> A. Contractor is solely responsible for quality assurance of temporary shoring. <br /> B. At each excavation support system location,provide the following: <br /> 1. Continual verification system is planned, executed, and maintained in accordance with ' <br /> applicable codes,regulations and good construction practice. <br /> 2. Systematic observation of suitability of shoring materials. <br /> 111 <br /> 3. Installation, excavation, settlement and lateral deflection monitoring. <br /> 4. Groundwater control. <br /> 5. Adjacent construction activities. <br /> 6. Other factors, as necessary. <br /> PERMITTING I <br /> C. Secure all permits necessary to complete the requirements of this Section. <br /> Legion Golf Course Stormwater Detention Project Excavation Support and Protection ' <br /> WO#UP3620 31 50 00-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.