My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 PRODUCTS <br /> 2.1 GENERAL <br /> A. Materials and equipment shall be safe and in good condition and shall conform to local, state <br /> and federal codes. <br /> PART 3 EXECUTION <br /> 3.1 GENERAL <br /> ' A. Provide sheeting, shoring and other protection and support systems wherever required, in <br /> accordance with current local, state and federal laws,codes and ordinances. <br /> B. The Contractor is solely responsible for excavation protection and worker safety. <br /> C. The Contractor shall be solely responsible for the protection of existing utilities and <br /> structures. Under no circumstance shall work threaten the integrity (physical and operational) <br /> of these utilities and/or structures. <br /> 3.2 EXCAVATION SUPPORT SYSTEMS <br /> A. The excavation support systems shall not disturb the state of soil adjacent to the trench or <br /> excavation and below the excavation bottom. <br /> ' B. Water control measures shall be provided at all times in accordance with the requirements <br /> specified in Section 31 23 19,Dewatering. <br /> ' C. The support system shall extend below the main excavation bottom elevation to a depth <br /> adequate to prevent hydrostatic uplift, seepage and piping, and lateral movement and to <br /> adequately support applied vertical loads. <br /> D. Damage to existing utilities or structures during installation of excavation support system <br />• <br /> shall be avoided. If damage occurs it shall be repaired at no cost to the Owner and to the <br /> ' satisfaction of the utility owner. <br /> E. A company representative from the excavation support system shall be onsite during initial <br /> ' setup of the system. Install excavation support system in strict conformance with the <br /> representative's recommendations. <br /> ' 3.3 CONTINGENCY PLAN IMPLEMENTATION <br /> A. Excess movements or settlements: Work shall be stopped immediately and the causes of <br /> ' excess or detrimental movements evaluated if: <br /> 1. Damage is noted to existing site features or surrounding properties. <br /> 2. Shoring wall movements exceed the limits specified herein or per submitted calculations. <br /> B. Immediately notify the Engineer and begin the implementation of the approved contingency <br /> plan to mitigate the effects of settlement or movement occurred. <br /> ' Legion Golf Course Stormwater Detention Project Excavation Support and Protection <br /> WO#UP3620 315000 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.