My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 REMOVAL OF SUPPORT SYSTEMS 111 <br /> A. Removal of excavation support systems shall be performed in a manner that does not disturb i <br /> or damage adjacent new or existing structures or utilities. <br /> B. Fill all voids immediately with specified backfill material. ' <br /> C. All damage to property resulting from removal shall be promptly repaired at no cost to the <br /> OWNER. The Engineer shall be the sole judge as to the extent and determination of the <br /> methods and materials for repair. <br /> 3.5 SCHEDULE <br /> A. A tight sheet excavation support system selected by the CONTRACTOR shall be provided <br /> for the excavation of the pipes and structures greater than 4ft in depth. <br /> END OF SECTION ' <br /> 1 <br /> I <br /> i <br /> 1 <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Excavation Support and Protection ' <br /> WO#UP3620 31 50 00-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.