My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT" <br /> CITY OF EVERETT, WASHINGTON <br /> PUBLIC WORKS <br /> UTILITIES <br /> ADDENDUM NO. 1 <br /> LEGION GOLF COURSE STORMWATER DETENTION PROJECT <br /> W.O. #UP 3620 <br /> DATE OF ISSUANCE: December 28, 2017 <br /> BID OPENING DATE AND TIME PER NOTICE TO CONTRACTORS — 2:00 PM JANUARY <br /> 9, 2018, AT THE CITY CLERK'S OFFICE, 2930 WETMORE AVENUE. <br /> Notice to Plan Holders: <br /> This Addendum No. 1 contains 14 pages and one attachment and contains revisions, <br /> additions, deletions, and/or clarifications and is hereby made a part of the contract <br /> documents for the above named project and shall be considered by all prospective bidders in <br /> submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 1 in the space provided in the Bid <br /> Proposal. Failure to do so render the Bid non-responsive and may cause its rejection. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> VOLUME I — SPECIFICATIONS <br /> 1. Division 00, Section 00 22 13, Supplemental Instructions to Bidders <br /> Part 1.2-A-1-a, delete Paragraph "a." in its entirety. <br /> Part 1.2-A-1-b-1, delete paragraph "1)" and replace with the following: <br /> "1) Bidder and/or subcontractor shall have successfully completed a minimum of three <br /> (3) golf course remodel projects on golf courses with the last ten (10) years, with a <br /> minimum value of $250,000 for each project reference provided." <br /> Part 1.2-A-1-b-2, delete Paragraph "2)" in its entirety. <br /> Part 1.2-A-2-a, delete "...five (5) years."and replace with "...ten (10) years." <br /> Part 1.2-B-1-b, delete Paragraph "b." in its entirety. <br /> Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.