My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 1.2-B-1-c-1, delete the first sentence in Paragraph "1)" and replace with the following: <br /> "List of three (3) projects completed in the last ten (10) years that involve the <br /> installation of a new irrigation system on a golf course." <br /> Part 1.2-B-1-d, delete Paragraph "d"in its entirety. <br /> Part 1.2-B-1-e, delete Paragraph "e"in its entirety. <br /> 2. Division 00, Section 00 41 13, Bid Form — Stipulated Sum <br /> Delete "Section 00 41 13, Bid Form — Stipulated Sum" in its entirety and replace with "Section <br /> 00 41 13, Bid Form — Stipulated Sum, Dated December 28, 2017", attached. Note quantity <br /> changes for Item No.s 9, 10, 14, 53 and 54. <br /> 3. Division 00, Section 00 45 13, Bidder Qualification Statement <br /> Part 1.2-A, delete the last sentence in Paragraph "A." and replace with the following: <br /> "A minimum of three reference project, each completed within the last 10 years, must <br /> be provided." <br /> 4. Division 00, Section 00 60 13, Contract <br /> Part 1.2-C, delete Section "C." in its entirety and replace with the following: <br /> "C. Contract Time. <br /> 1. Substantial Completion of the Work shall be achieved within 145 calendar <br /> days after the effective date of the Notice to Proceed. <br /> 2. Physical Completion shall be within 60 calendar days after the actual date of <br /> issuance of substantial completion. <br /> 3. Date of Notice to Proceed is anticipated on or near March 1, 2018. <br /> 4. Refer to Section 01 12 16, Work Sequence for specific work constraints and <br /> milestones." <br /> 5. Division 1, Section 01 12 16, Work Sequence <br /> Part 1.3-B-3, delete Paragraph "3." in its entirety and replace with the following: <br /> "3. Complete the installation of all golf scape areas, plantings and initial watering by <br /> August 1, 2018." <br /> Part 1.3-B-4, delete Paragraph "4." in its entirety and replace with the following: <br /> "4. Complete the installation of the stormwater piping and ponds so they are functional <br /> and ready to receive stormwater flow by July 1, 2018." <br /> 6. Division 1, Section 01 22 00, Measurement and Payment <br /> Part 1.2, Item No. 14, Abandon Existing Manhole, delete the fourth bullet. <br /> Part 1.2, Item No 21, Pond Excavation and Earthwork, North Detention Pond (Existing) & <br /> Item No. 22, Pond Excavation and Earthwork, South Detention Pond, add the following after <br /> the first sentence: <br /> Page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.