Laserfiche WebLink
, S <br /> 5. IBC 414.2.4 requires all construction supporting the horizontal assembly of item 4 <br /> (above) to also have a 2-hour fire resistance rating. This protection must be continuous <br /> from the control room floor to the ground. <br /> 6. Please clarify the design criteria on the cover page (G1.0). In the event of future tenant <br /> improvements that might involve hazardous materials, it is necessary to verify exactly <br /> where, how much and how the butane will be stored and used. <br /> 7. The fire code official will be requiring automatic fire suppression in the extraction room. <br /> Information to facilitate this should be included in the plans. <br /> If you have any questions, please call me at 425-257-7264. <br /> Please prepare a response letter showing where each item in this correction letter is addressed on the <br /> plan set. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br /> All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, tr j1 �f <br /> Steve Miller <br /> Associate Engineer <br />