My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/02/28 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/02/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 10:28:08 AM
Creation date
3/5/2018 10:26:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Risks from Natural Hazards <br /> Identified risks are a product of hazards and their associated impacts.Earthquakes,flooding,severe storms,climate <br /> change,and landslides were determined by the Steering Committee to represent the probable ha'zards with the <br /> greatest impacts.The 2017 Hazard Inventory and Vulnerability Analysis (HIVA) describe these risks in detail.The fol- <br /> lowing areas are where risk reduction is needed and will be described further in Chapter 2. <br /> ✓ Isolation <br /> ✓ Vulnerable Structures <br /> ✓ BNSFTunnel <br /> ✓ Industry Dependence <br /> ✓ Waterfront and Port Exposure <br /> Strategy Areas <br /> Action items arose from the storytelling process and flowed from what participants valued and appreciated.This <br /> includes the Steering Committee's risk ranking assessment and goals.The action items are organized into five general <br /> strategy areas. <br /> Infrastructure:This strategy area supports Everett's positive efforts to replace,upgrade,and increase the redundancy <br /> of infrastructure systems while improving disaster response capabilities. <br /> Buildings:This strategy area helps to assure vulnerable buildings become safer through code driven triggers and <br /> incentives along with trainings for post-disaster assessments. <br /> Trainings and Exercises:This strategy area supports the positive work Everett has done to prepare residents and the <br /> workforce to overcome isolation,reduced services,and barriers to recovery. <br /> Planning:This strategy area seeks to incorporate opportunities into the planning process to reduce risk and support <br /> disaster recovery while advancing the community vision. <br /> Waterfront and Port:This strategy area seeks to reduce the isolation of the Waterfront and Port while increasing the <br /> ability of entities to function initially with limited resources and support services. <br /> 2017 Hazard Mitigation Plan Action Items <br /> The following table summary lists all the action items from the 2017 HMP.Action items are grouped under the <br /> related strategy area heading. <br /> 2017 HAZARD MITIGATION PLAN ACTION ITEMS <br /> Item Description <br /> INFRASTRUCTURE <br /> IN I Implement an earthquake early warning system in key locations throughout the City. <br /> IN2 Support efforts to improve the resiliency of major transportation corridors 1-5,US 2,and SR 529. <br /> IN3 Set up dedicated city funding for intermediate-size bridge repair projects. <br /> IN4 Complete an assessment of post-earthquake response to repairing the in-city water system. <br /> 1N5 Implement recommendations from the 2012 Water Supply Risk Assessment and the forthcoming Regional <br /> Water Supply Resiliency Study. <br /> 1N6 Complete an assessment of the need for backup generators at water pump sites and secure funding for <br /> generator gaps. <br /> 1N7 Complete an assessment of the City's fueling infrastructure with recommendations for improvements. <br /> City of Everett 2017 Hard Mitigation Plan - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.