Laserfiche WebLink
2017 HAZARD MITIGATION PLAN ACTION ITEMS <br /> Item Description <br /> INFRASTRUCTURE <br /> IN8 Build a fiber communication and data loop connecting City Emergency Operations Center. <br /> IN9 Complete an assessment of the earthquake response of the Regional Wastewater Treatment Plant building <br /> and siphons. <br /> IN 10 Complete an assessment of critical sewer pipelines with recommendations for improvements. <br /> IN I I Acquire Port Gardner Wet Weather Facilities to provide additional combined sewer and stormwater <br /> capacity. <br /> IN 12 Plan to build a backup transmission line to provide redundant water supply to Reservoir#3. <br /> BUILDINGS <br /> BD I Construct a backup water supply source for Providence Regional Medical Center Everett. <br /> BD2 Complete an assessment of unreinforced masonry (URM) buildings with recommendations for protecting <br /> public safety. <br /> BD3 Seismically retrofit or rebuild critical city facilities including the Public Works building. <br /> BD4 Implement cross-departmental Post-Disaster Building Safety Assessment Training on a repeating cycle. <br /> BD5 Create an Earthquake Home Foundation Retrofit Program for homes not secured to their foundations. <br /> BD6 Implement non-structural mitigation measures in city facilities. <br /> EXERCISES AND TRAININGS <br /> ETI Improve Fire Department emergency response capabilities on the Waterfront to address the plans for new <br /> housing,public attractions and businesses. <br /> ET2 Train and encourage existing volunteers and community groups to do outreach and participate in <br /> community preparedness planning. <br /> ET3 Develop a City of Everett Continuity of Operations Plan (COOP) program that assesses each <br /> department's status and encourages next steps. <br /> ET4 Assist local businesses and non-profits with business continuity planning and exercises. <br /> ET5 Identify more Emergency Cooling Centers and inform the public. <br /> ET6 Perform a Smith Island Exercise. <br /> PLANNING <br /> PL I Create a basic Post-Disaster Recovery Framework. <br /> PL2 All long-range plans should include a recovery framework and a review of potential hazards. <br /> PL3 Continue to embed hazards mitigation into the Comprehensive Plan and related codes and ordinances. <br /> PL4 Develop a proposal for a gravel,gated emergency-use-only access ramp from Smith Island to 1-5. <br /> PL5 Identify potential emergency access routes to neighborhoods and determine what is required to <br /> implement them. <br /> PL6 Explore the potential of small commercial hubs in neighborhoods without such hubs. <br /> WATERFRONT AND PORT <br /> WP I Work with BNSF Railway to keep Bond Street open for emergency access to the Port. <br /> WP2 Fund increased systems connections to existing large capacity backup generator. <br /> WP3 Create a Waterfront Climate Change Plan for long-term adaptation. <br /> WP4 Identify Temporary Outdoor Gathering Areas. <br /> WP5 Complete an assessment of the potential for tsunami gathering areas on Jetty Island. <br /> City of Everett 2017 Hzgard Mitigation Plan -4 <br />