Laserfiche WebLink
development of Lot 1 with 179,565 SF of warehouse and light manufacturing, with accessory office <br /> space. (SEPA #30-90, BSP#1-90) The approvals also included requirements for the reclamation of <br /> the site and restoration of Merrill and Ring Creek, which runs adjacent to Hardeson road. The <br /> property is zoned M-2. Special conditions were placed on the project through recorded covenants that <br /> restrict permitted uses and require special landscaping, until such time as the city places similar <br /> conditions through revisions to the zoning code. The project on Lot 1 has not been constructed but <br /> may be constructed per the current approved plan. <br /> Intrawest Seaway Center <br /> In 1994, the City approved construction of two buildings totaling 230,000 to 300,000 SF for use as <br /> office, manufacturing and warehouse space on a 36.3 acre site located south of Merrill Creek Parkway <br /> (SEPA #18-94). The project included the realignment and restoration of Narbeck Creek and wetlands <br /> mitigation for wetlands filled under a previous approval (SEPA #37-89). The project has not been <br /> constructed and wetland mitigation has not been completed. <br /> John Dahl Properties/Evergreen Properties <br /> In 1995, the City approved construction of up to 65,600 SF in three buildings on a site located at the <br /> southeast corner of Hardeson Road and 75th Street SW/Sievers-Ducey Blvd. (SEPA #46-94). The <br /> approvals included the fill of some site wetlands and construction of mitigation wetlands adjacent to <br /> remaining wetlands on the site. Development of the site has not begun. <br /> Dennis Petroleum <br /> In 1995, the City approved construction of an approximately 35,000 sf office/warehouse building on <br /> 80th Street SW (SEPA #22-95). The Building Division is currently reviewing a building permit <br /> application for the project. <br /> 4.4 Projects Subject to Concomitant Agreements with Completed SEPA Reviews <br /> Intermec Corporation <br /> Intermec is constructed on a 105 acre site covered by a concomitant agreement to a rezone ordinance <br /> (Rezone #5-86, SEPA#54-86). The concomitant agreement limits uses on the property, and contains <br /> standards for landscaping, buffers, height limitations, transportation and circulation, public utilities, <br /> lighting and glare, signing, parking, loading, outdoor storage, fences, noise, air pollution, vibrations, <br /> radiation, electromagnetic radiation, building coverage, and building design. The agreement required <br /> SEPA review and site plan review of detailed development proposals on the site. <br /> In 1989, the City reviewed a 3-phase development proposal by Intermec for the site (SEPA #32-89). <br /> Phase 1, which consists of 312,000 SF of office, light manufacturing and warehouse space, has been <br /> constructed. Phase 2, an additional 100,000 SF of office, manufacturing and warehouse space has not <br /> yet been constructed, but is vested under the conditions of SEPA #32-89, including requirements for <br /> payment of traffic mitigation fees. <br /> 19 <br />