Laserfiche WebLink
h. Program 298, Oakes Bridge Replacement <br /> Preliminary Engineering <br /> 1 . Appropriation $ 50, 000 <br /> 2 . Source of Funds <br /> BRM $40, 000 <br /> Local $10, 000 <br /> i . Program 320, 7th Avenue SE Warning Device <br /> 1 . Appropriation $ 20, 000 <br /> 2 . Source of Funds <br /> HHS $ 7, 200 <br /> Arterial Gas Tax $12 , 800 <br /> j . Program 321 , 41st Street and Rucker-Colby Signal <br /> Reconstruction <br /> 1 . Appropriation $210, 500 <br /> 2. Source of Funds <br /> FAUS $111 , 150 <br /> HHS $ 68, 850 <br /> Arterial Gas Tax $ 30, 500 <br /> k. Program 349 , 12th Street Realignment at Rainier <br /> 1 . Appropriation $ 87 , 500 <br /> 2. Source of Funds : <br /> Private Developer : $ 37, 500 <br /> Arterial Gas Tax : $ 50, 000 <br /> 1 . Program 350, N. Broadway & Tower Street <br /> Signalization <br /> 1 . Appropriation $113, 869 <br /> 2. Source of Funds <br /> Private Developer $ 42 , 369 <br /> Arterial Gas Tax $ 71 , 500 <br /> m. Program 351 , Fastmont Bridge Traffic Signal <br /> Interconnect Conduit Installation with WSDOT <br /> Bridge Construction <br /> 1 . Appropriation $ 35 , 000 <br /> 2 . Source of Funds <br /> Arterial Gas Tax $ 35 , 000 <br /> n. Program 352, Everett Mall Way (SCL & I -5) <br /> Traffic Control Markings Being Installed by <br /> WSDOT Contractor on State Overlay <br /> 1 . Appropriation $ 21 , 000 <br /> 2. Source of Funds <br /> Arterial Gas Tax $ 21 , 000 <br /> o . Program 353, Broadway (41st-10th) Traffic <br /> Control Markings and Signal Detection Loops <br /> Being Installed by WSDOT Contractor on State <br /> Overlay Project <br /> 1 . Appropriation $ 69, 000 <br /> 2. Source of Funds <br /> Arterial Gas Tax $ 69, 000 <br /> 4 <br />