Laserfiche WebLink
proposal per 43.21G:031 RCW. This determination is dependent upon compliance with the SW <br /> Everett Subarea Plan Mitigation Decision Document and all local, state, and federa! regulations <br /> related to general environmental protection including, but not limited to, right-of-way improvement <br /> requirements; drainage, etc. This decision was made after review of a corripleted environmental <br /> checklist and ather'infc�rmation on file with the lead agency. There is no public comment period <br /> provided for thi5 determination. <br /> Responsible <br /> Official: Allan Giffen, Director Phone: (425)257-8731 <br /> Title: Planning and Community Development Interim Responsibfe Official <br /> Address: 2930 Wetmore Avenue,Suite 8-A, Everett, WA 98201 <br /> Date: December 8, 2016 <br /> Signature: ��r={�DI' (�(i�i�� �Z,l� ' 1 <br /> There is no administrative appeal provided for this determination. <br /> �` N�TE: This Planned Action Determination may be withdrawn in the event of significant changes in <br /> y�, the proposaf, disclosure of new significant information, misrepresentation by the applicant, or <br /> ,t1 failure to comply with the existing regulations ar the conditions in the Mitigation Decision <br /> � Document. <br /> � INFORMATION FOR DEVELOPER: . <br /> Planning Department—Teresa Weldon—425.257.7281 <br /> � The Master Plan Development Matrix and Map shall be amended to include all updates to <br /> all buildings. Submit the updated Master Plan Development Matrix and Map to the Planning <br /> Department,Attn:Teresa Weldon. <br /> 2. Submit a copy of this Planned Action Determination along with your Public Works permit <br /> application. Reference the SEPA number (SEPA16-033)on all permit application forms. <br /> Engineering/Public 5ervices Department—Benyam Stephanos—425.257J289 <br /> 1. Constructian permits, inspections and final approvals are required for this project from Gity of <br /> Everett Permifi Service5. <br /> 2. A Public Vi/orks Permi�is required for this project. Detai{ed drawings in accordance with <br /> City Design and Construction Standards shall be submitted to the Public Works Qepartment, <br /> showing site layoufi, landscaping, utilities,storm drainage,temporary construction erosion <br /> control, and all required improvements in the public right-of-way. Public Works <br /> Department approval of these drawings is required priorto any permits being issued. All <br /> improvements shall be completed, approved and warranted before the Occupancy Permit is <br /> issued/final approval is granfied. <br /> `3. Any grading/fill on this site shall be done so as to not impact fihe surrounding properties. <br /> SEPAl&- <br /> � <br /> �-' <br />