Laserfiche WebLink
• <br /> Plans for such system shall be submitted to the Fire Code Official for review and approval prior to <br /> installation. Submittal shall include cut sheets of all equipment intended for use. Appropriate trip <br /> tests,witnessed by a Fire Department Inspector,shall be performed, along with a certificate of <br /> completion, prior to final acceptance of the system. <br /> Fire alarm systems shall be installed according to NFPA Chapter 72, 2010 Edition. Installation of fire <br /> alarm components, including basic wiring, may not commence before plans are approved by the Fire <br /> Department Plan Reviewer. Fire alarm drawings must be professionally rendered,in sufficient <br /> detail,and must be internally consistent. Riser diagrams must match installation plans and load <br /> calculations. Components must be listed and approved for use together. Changes to plans must <br /> include new drawings and calculations and must be approved by the Fire Department Plan Reviewer <br /> prior to installation. Fire alarm installation is subject to field inspection by a Fire Department <br /> Inspector. An approved set of plans and the Engineering& Public Services Department electrical <br /> permit must be present for any installation inspection. <br /> Fire alarm systems shall be installed under permit of the City of Everett Engineering& Public <br /> Services Department. Electrical inspections and approval are required prior to calling for acceptance <br /> tests. Call (425)257-8810 for permit information. <br /> The absence of working phone lines for the alarm system will be cause for postponing Fire <br /> Department inspection and testing and shall result in denial of occupancy. <br /> A copy of NFPA 72 Record of Completion form must be filled out prior to final occupancy(NFPA 72, <br /> 2010 Edition,Chapter 10,page 114). <br /> Call for design requirements per Authority Having Jurisdiction. <br /> Automatic smoke detection is required. <br /> 16. Fire Suppression(Sprinkler)System(work in conjunction with Boeing Fire engineer on system)-An <br /> approved automatic suppression system shall be provided as required by City Ordinance No.3021- <br /> 07,Chapter 16.76,of the Everett Municipal Code. The system must include a mechanical water <br /> gong bell. <br /> Plans for any such system shall be submitted to the Engineering&Public Services Department for <br /> examination and approval. Such plans shall include plans for the underground mains that will supply <br /> the sprinkler system. <br /> The type of sprinkler to be installed will be determined by the Building Official. It may be an NFPA <br /> 13, NFPA 13R,or NFPA 13D system depending upon several factors. Sprinkler installation shall not <br /> begin without an approved and stamped set of plans from the Engineering&Public Services <br /> Department. The Fire Department will also review the plans and shall field inspect the installation <br /> based only on approved plans that must be on site. Changes to plans must be approved by both the <br /> Engineering&Public Services and Fire Departments. <br /> Aboveground sprinkler piping shall be hydrostatically tested as established in NFPA Standard 13. <br /> Underground piping shall be hydrostatically tested and flushed as established in NFPA Standard 24 <br /> for private fire mains. (Below-ground piping must be installed by Washington State Patrol Licensed <br /> 4 <br /> b <br />