My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Swab the internal surfaces of closure fittings with a 5 to 6 percent chlorine solution <br /> that can be found in liquid household sodium hypochlorite bleach. <br /> 7-09.3(24)H Final Flushing and Testing <br /> Notify the City Utilities Division, Environmental Monitoring and Compliance (EMC) <br /> staff at least five business days prior to requiring EMC staff to collect samples and <br /> measure the chlorine concentration of the disinfectant solution placed in the new <br /> main. EMC staff will collect and measure samples at the start and at the end of <br /> the disinfectant contact period. <br /> Provide sample taps as noted in 7-09.3(24)1 to allow EMC staff to collect at least I <br /> one set of disinfectant concentration, coliform bacteria and free chlorine samples <br /> from both ends of new mains, at the end(s) of each cross or branch, and every <br /> 1200 feet along the main. <br /> Notify EMC staff at least five business days prior to requiring having EMC staff <br /> collect final coliform bacteria and free chlorine residual samples. <br /> The City of Everett EMC staff will collect bacteriological and disinfectant residual <br /> samples for submitting to Washington State Department of Health, Drinking Water <br /> Division certified laboratory for testing. EMC staff will immediately notify <br /> Contractor and Engineer upon receiving analysis results. <br /> Upon receiving passing test results, flush disinfectant solution from the newly-laid <br /> mains until the replacement water throughout the length of the main tests having a <br /> level of free chlorine residual representative of the distribution system water 111supply. <br /> 7-09.3(24)1 Sample Collection Taps <br /> Provide water sample collection taps at each required sampling location in <br /> accordance with COE Standard Drawing No. 526 and as described in these <br /> Special Provisions. <br /> Locate the end of each water sample collection tap above existing ground level. <br /> Plumb taps to provide downward water flow to allow effective filling of sample <br /> containers. City EMC staff shall have the authority to refuse to conduct sampling <br /> from taps they consider inadequate or not representative of water main quality. <br /> On mains exceeding 1,200 feet, provide for sample collection at one of the water <br /> 111 <br /> services shown on the Plans. If no water services are shown on the Plans, provide <br /> 3/4-inch sampling tap at appropriate locations along the main. <br /> For mid-line service taps not providing future customer service, plumb into dead- <br /> end meter setters and meter boxes at the street or sidewalk edge for use as future <br /> dedicated sampling locations in accordance with COE Standard Drawing No. 526. <br /> Locate sample tap upstream of the flushing hose connection for bacterial and <br /> disinfectant residual sampling. Due to sanitary and representative sampling <br /> issues, use only installed sample taps for collection of free chlorine or <br /> bacteriological samples. I <br /> 7-09.3(24)J Repetition of Flushing and Testing <br /> Should the initial disinfection procedure result in an unsatisfactory bacteriological <br /> test, meaning total coliform bacteria is present, repeat the entire flushing and <br /> disinfection procedure until obtaining satisfactory test results. Unsatisfactory test <br /> results indicates Contractor's failure to keep the pipe, sample taps, and temporary <br /> filling attachments clean during construction, or to properly flush and disinfect the <br /> main. <br /> Supplement 7-09.3 by adding the following: <br /> Water Main Replacement"Q" Division 7—STORM,SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—156 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.